INSP-Final Inspection | 3/1/2007 | 3/1/2007 | 3/1/2007 | P | PASS |
Forrest France
|
|
|
Required corrections field verified for compliance, fire alarm permit finaled.
|
INSP-Final Inspection | 2/28/2007 | 2/28/2007 | 2/28/2007 | P | CANC |
Forrest France
|
|
|
Forest,
Could you close this permit?
Thanks,
Rob Inspection cancelled from web by: Terry Owsley
|
INSP-Final Inspection | 8/29/2006 | 8/31/2006 | 8/31/2006 | P | CANC |
Forrest France
|
|
|
rob's phone Internet Inspection Request from: Terry Owsley Cancel per contractor
|
INSP-Final Inspection | 8/29/2006 | 8/30/2006 | 8/30/2006 | P | PART |
Forrest France
|
|
|
Visual notification is lacking in one area due to architectural changes not reflected on approved plans, some portions of the alarm work as outlined in the scope of work are not completed for testing at this time, list of signals recieved for devices tested today to be made available prior to next inspection.
|
Issue and Print Permit | | | 8/8/2006 | | DONE |
|
|
|
|
Alarm Plan Check | 7/19/2006 | | 8/4/2006 | | PASS |
|
|
|
Approved by FV subject to attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/4/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/4/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/4/2006 | | 8/4/2006 | | DONE |
|
|
|
|
Telephone call | | | 8/4/2006 | | DONE |
|
|
|
left vm@###-####/told permit was ready, permit#, address, and fee
|
Application received | | | 7/19/2006 | | |
|
|
|
|
Case Summary | | | 7/19/2006 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 7/28/2006 | | | | |
|
|
|
mailed to FV
|
Plan assigned to (Mary) | 7/19/2006 | | | | |
|
|
|
|