INSP-Final Inspection | 6/19/2008 | 6/20/2008 | 6/20/2008 | A | PASS |
Forrest France
|
|
|
Verified items on correction notice for compliance, inspection passed, permit finaled.
|
INSP-Final Inspection | 6/16/2008 | 6/19/2008 | 6/19/2008 | A | DEFR |
Forrest France
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/6/2008 | | DONE |
|
|
|
picked up modification
|
(F) Reprint permit | | | 6/6/2008 | | DONE |
|
|
|
|
Plan assigned to (OutSourced) | 5/14/2008 | | 6/3/2008 | | PASS |
Patricia Smith
|
|
|
6/3/2008 12:00:11 P_S - activity updated through activity FIRA22 from case FIR06-00540.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/3/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/3/2008 | | 6/3/2008 | | DONE |
|
|
|
|
Telephone call | | | 6/3/2008 | | DONE |
|
|
|
t/c w tom householder at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 6/3/2008 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 1/8/2008 | | 6/3/2008 | | PASS |
Patricia Smith
|
|
|
6/3/2008 12:00:11 P_S - activity updated through activity FIRA22 from case FIR06-00540.
|
Sprinkler Plan Check | 5/14/2008 | | 5/31/2008 | | PASS |
|
|
|
plans are approved
|
INSP-Final Inspection | 4/8/2008 | 4/10/2008 | 4/11/2008 | A | FAIL |
Forrest France
|
|
|
See notes per inspection completed 4/11.
|
INSP-Final Inspection | 4/10/2008 | 4/11/2008 | 4/11/2008 | A | FAIL |
Forrest France
|
|
|
See 12 item correction notice left on site for a list of defficient items including descriptors at several tamper and flow switches, missing head boxes and spare stock of sprinklers, noted missing coverage at four new stairwell pressure fan rooms at the mech. penthouse, need to demo class 2 fire hose cabinet valves no longer connected at the penthouse, roof and basement levels, missing sprinkler protection at the penthouse level cooling tower room enclosure, repair 2nd floor NE flow switch and NE basement tamper, supervisory signals shall report at the panel within 90 seconds per NFPA 72, provide signage at stairway standpipe isolation control valves, repair tamper and flow switches at the 5th floor NE riser, need signage at the doors to control valve rooms on the 5th floor NE and SW risers, noted seismic ugrades for the standpipe floor level penetrations have not been provided.
|
INSP-Final Inspection | 4/2/2008 | 4/7/2008 | 4/7/2008 | A | FAIL |
Forrest France
|
|
|
Started testing flow and tamper switches, found that the programing to the fire alarm panel was not correct. Stopped inspsection.Will have to perform a complete retest on next inspection. KR
|
INSP-Final Inspection | 3/27/2008 | 3/28/2008 | 3/28/2008 | A | NR |
Forrest France
|
|
|
Scheduled by a contractor via Hello! on 3/27/2008 at 3:25:39 PM. Contact: ###-####.
|
INSP-Final Inspection | 3/25/2008 | 3/27/2008 | 3/27/2008 | P | NR |
Forrest France
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 3/24/2008 | 3/25/2008 | 3/25/2008 | A | PART |
Forrest France
|
|
|
Accepted photographic documentation of seismic bracing at four locations including the plaza level NE, NW, SE, and SW corner 4-way braces inaccessible for viewing due to confined space and asbestos abatement. Images attached under "Documents"
|
INSP-Sprinkler Rough-in/Hydro | 3/18/2008 | 3/21/2008 | 3/21/2008 | A | PART |
Forrest France
|
|
|
Inspection completed satisfactory for the seismic upgrade work at the plaza level mains, also inspected the remainder of 2" feed piping for the plaza level bridge lines. Hydrostatic testing for this portion of work passed.
|
INSP-Sprinkler Rough-in/Hydro | 3/12/2008 | 3/14/2008 | 3/12/2008 | A | CANC |
Forrest France
|
|
|
Scheduled by a contractor via Hello! on 3/12/2008 at 2:51:37 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Mar 12 2008 5:20PM.
|
INSP-Sprinkler Rough-in/Hydro | 3/5/2008 | 3/6/2008 | 3/6/2008 | P | PART |
Forrest France
|
|
|
Inspection for the seismic upgrade areas at the plaza level to be completed in conjunction with the hydrostatic test for this level per agreement.
|
INSP-Sprinkler Rough-in/Hydro | 2/25/2008 | 2/25/2008 | 2/25/2008 | A | PART |
Forrest France
|
|
|
Need to repair fireproofing at locations where removed for hanger attatchments, okay for ceiling cover when complete.
|
INSP-Sprinkler Rough-in | 2/19/2008 | 2/20/2008 | 2/20/2008 | A | PART |
Forrest France
|
|
|
OH installation for the plaza level branch lines and sprinklers as annotated on stamped plans is approved for cover, preliminary hydrostatic has been completed- will retest when the balance of the new main is finished.
|
CHANGE STATUS TO (ISS) | | | 2/19/2008 | | DONE |
|
|
|
Actually was no re-submital on 1-10-08 BAS
|
INSP-Sprinkler Rough-in/Hydro | 1/14/2008 | 1/15/2008 | 1/15/2008 | A | PART |
Forrest France
|
|
|
Overhead rough-in is approved for cover at the drop ceiling areas as red lined and initialed on the stamped drawings, noted one head at a corridor to be replaced due to visible leakage at the seat.
|
INSP-Sprinkler Rough-in/Hydro | 1/14/2008 | 1/14/2008 | 1/14/2008 | A | CANC |
Forrest France
|
|
|
daryl - ###-####
|
Sprinkler Plan Check | 1/8/2008 | | 1/10/2008 | | FAIL |
|
|
|
The plans were submitted incorrectly under the wrong FIR # & the wrong BLD #. Upon request, the denied set may be retrieved from my office for salvage. The denied set will be maintained for 5 working days.
|
Plan resubmittals received | | | 1/8/2008 | | |
|
|
|
plan modification; received three copies of application, product info and sheet 16 of 20; taken to fire review
|
INSP-Sprinkler Rough-in/Hydro | 1/4/2008 | 1/7/2008 | 1/7/2008 | A | PART |
Forrest France
|
|
|
Noted on plans areas approved for cover at the drop ceilings 5th floor south and southeast. Also noted plans do not indicate sprinkler coverage to be provided at the 5th floor elevator lobby.
|
INSP-Sprinkler Rough-in/Hydro | 12/26/2007 | 12/27/2007 | 12/27/2007 | A | PART |
Forrest France
|
|
|
OH hydrostatic testing for the 3rd floor SW quad passed, OH rough-in inspection also completed and okayed for cover as noted, two minor items repaired while on site, one head as annotated on plans to be relocated due to shadowing at an adjacent wall-can be verified at next scheduled visit.
|
Issue and Print Permit | | | 12/19/2007 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 12/10/2007 | | 12/18/2007 | | PASS |
|
|
|
12/18/2007 10:20:49 CMB - activity updated through activity FIRA22 from case FIR06-00540.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/18/2007 | | DONE |
|
|
|
|
Telephone call | | | 12/18/2007 | | DONE |
|
|
|
lft vm with tom housholder ###-#### that permit and fees are ready to be picked up
|
Inspection Record Card- Fire | 12/18/2007 | | 12/18/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/18/2007 | | |
|
|
|
|
Sprinkler Plan Check | 12/10/2007 | | 12/15/2007 | | PASS |
|
|
|
Note:
This was the 7th review of these plans. with in this modification, 72 heads were affected.The contractor submitted only two copies of the plans for processing Plan Modification are approved by Bryan Johnson
|
Plan resubmittals received | | | 12/10/2007 | | |
|
|
|
received two copies of application and pages 17 of 20 and 18 of 20; taken to fire review
|
(F) Reprint permit | | | 12/10/2007 | | DONE |
|
|
|
|
(F) Reprint permit | | | 11/30/2007 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/30/2007 | | DONE |
|
|
|
picked up approved revised plans
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/29/2007 | | |
|
|
|
|
Override - Parcel Holds | | | 11/29/2007 | | |
|
|
|
|
Inspection Record Card- Fire | 11/29/2007 | | 11/29/2007 | | DONE |
|
|
|
|
Telephone call | | | 11/29/2007 | | DONE |
|
|
|
lft vm with tom housholder ###-#### that permit and fees are ready to picked up
|
Permit Ready to Issue | | | 11/29/2007 | | |
|
|
|
|
Sprinkler Plan Check | 11/13/2007 | | 11/28/2007 | | PASS |
|
|
|
This was a plan modification on the third floor. This was the 6th review of this project. A total of 72 heads were affected with in the modification. Plans are approved by Bryan Johnson
|
INSP-Sprinkler Rough-in/Hydro | 11/26/2007 | 11/27/2007 | 11/27/2007 | A | PART |
Forrest France
|
|
|
Hydro test passed. Ok to cover northwest side of the third floor. As per KR
|
Override - Parcel Holds | 11/26/2007 | 1/1/1900 | 11/26/2007 | | |
|
|
|
FIR
|
INSP-Sprinkler Rough-in/Hydro | 11/14/2007 | 11/15/2007 | 11/15/2007 | A | PART |
Forrest France
|
|
|
Rough-in is okay as noted on approved plans for the 4th floor NW quad. OH hydrostatic testing for this area also passed, also inspected overhead install at the 3rd floor west and south skybridges.
|
Plan resubmittals received | | | 11/13/2007 | | |
|
|
|
received app. with each plan--"3" total- plans put on fire shelf
|
(F) Reprint permit | | | 11/1/2007 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/1/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/31/2007 | | 10/31/2007 | | DONE |
|
|
|
|
Telephone call | | | 10/31/2007 | | DONE |
|
|
|
Tom called to verify that permit is ready and it is ready to be picked up 2:30 pm cmc
|
Permit Ready to Issue | | | 10/31/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/31/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 10/24/2007 | | 10/30/2007 | | PASS |
|
|
|
plans approved as submitted by bryan johnson
|
Sprinkler Plan Check | 10/24/2007 | | 10/30/2007 | | PASS |
|
|
|
plans approved as submitted by bryan johnson
|
INSP-Sprinkler Rough-in/Hydro | 10/26/2007 | 10/29/2007 | 10/29/2007 | A | PART |
Forrest France
|
|
|
Hydrostatic test for the 3rd floor NE quad passed, OH rough-in is also acceptable pending repair of beam fireproofing at noted locations where it has been removed to install branch line hangers, also noted field modifications to floorplan layout to be documented on as-built plans.
|
Plan resubmittals received | | | 10/24/2007 | | |
|
|
|
received app (1) sheet, & "3" sets of plans- plans put on fire shelf
|
INSP-Sprinkler Rough-in/Hydro | 10/9/2007 | 10/10/2007 | 10/10/2007 | A | PART |
Forrest France
|
|
|
Ok to cover 3rd floor south east area,Hydro test passed.
|
(F) Reprint permit | | | 10/1/2007 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/1/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/27/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/27/2007 | | 9/27/2007 | | DONE |
|
|
|
|
Telephone call | | | 9/27/2007 | | DONE |
|
|
|
left vm for tom housholder at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 9/27/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 9/10/2007 | | 9/24/2007 | | PASS |
|
|
|
plans are approved as submitted by bryan johnson
|
CHANGE STATUS TO (ISS) | | | 9/10/2007 | | DONE |
|
|
|
picked up approved plan mod/resubs
|
(F) Reprint permit | | | 9/10/2007 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/10/2007 | | |
|
|
|
Plan modification: Recieved three copies of application, seismic bracing calcs and page 7 of 20, and 8 of 20; taken to fire review; per Sam Rogers leave permit in ISS status so they can get inspections on other parts of the building not being modified.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/6/2007 | | DONE |
|
|
|
|
Telephone call | | | 9/6/2007 | | DONE |
|
|
|
tlk to tom housholder ###-#### that permit and 4th fee is ready to be picked up
|
Inspection Record Card- Fire | 9/6/2007 | | 9/6/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/6/2007 | | |
|
|
|
|
Telephone call | | | 8/30/2007 | | DONE |
|
|
|
Per telcon with BJ, this extensive plan mod required 203 heads on 3rd and 4th floors to be reviewed due to architectural changes made after original plans were issued. This is not a resubmittal, it is a plan modification. Plan review fee to be based on 203 additional heads.
|
Sprinkler Plan Check | 8/20/2007 | | 8/30/2007 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
INSP-Sprinkler Rough-in/Hydro | 8/21/2007 | 8/22/2007 | 8/22/2007 | A | PART |
Forrest France
|
|
|
OH hydrostatic test of the 4th floor west quad as marked on approved plan set passed, also inspected additonal corridor ceilings at the NW exit.
|
Plan resubmittals received | | | 8/20/2007 | | |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 8/15/2007 | 8/16/2007 | 8/16/2007 | A | PART |
Forrest France
|
|
|
OH inspection for the 4th floor SW quadrant including the kitchen, cafeteria, eating areas, hallway and dining room as marked on approved plans are okay for ceiling cover. Hydrostatic testing for this area to be completed in conjunction with the next pahase of this floor. Also discussed scheduling for the basement seismic upgrades.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/10/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/10/2007 | | 8/10/2007 | | DONE |
|
|
|
|
Telephone call | | | 8/10/2007 | | |
|
|
|
tlk to ron holmgren ###-#### that permit is ready no fees past maximum
|
Permit Ready to Issue | | | 8/10/2007 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/10/2007 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/10/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/6/2007 | | 8/8/2007 | | PASS |
|
|
|
Plans are approved w/conditions by Bryan Johnson
|
Plan resubmittals received | | | 8/6/2007 | | |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 7/26/2007 | 7/27/2007 | 7/27/2007 | A | PART |
Forrest France
|
|
|
Inspection for the 1st floor SW quad OH fire sprinkler install is conditionally approved for cover except as noted on plans and pending satisfactory resubmittals matching the initialed field plan set.
|
INSP-Sprinkler Rough-in/Hydro | 7/24/2007 | 7/25/2007 | 7/25/2007 | A | PART |
Forrest France
|
|
|
OH hydrostatic test for the 5th floor SW quad passed.
|
INSP-Sprinkler Rough-in/Hydro | 7/19/2007 | 7/23/2007 | 7/23/2007 | A | FAIL |
Forrest France
|
|
|
Inspection for the first floor SE quad failed due to significant floor plan changes in comparison to approved drawings.
|
INSP-Sprinkler Rough-in/Hydro | 7/18/2007 | 7/19/2007 | 7/19/2007 | A | PART |
Troy Cobbley
|
|
|
The hydro test for the first floor southwest quadrant passed. The rough-in failed since the floor plan does not match the plans. I told both the fire sprinkler contractor and the general contractor I would not give permission to cover. The general contractor stated he was going to cover the piping no matter what and would deal with the reperconssions later.
|
INSP-Sprinkler Rough-in/Hydro | 6/29/2007 | 7/2/2007 | 7/2/2007 | A | PART |
Forrest France
|
|
|
OH hydrostatic test for the wet system 1st floor NW quad passed.
|
INSP-Sprinkler Rough-in/Hydro | 6/21/2007 | 6/22/2007 | 6/22/2007 | A | PART |
Forrest France
|
|
|
OH rough-in inspection for the 1st floor NW quad, noted three retaining straps not attatched to the beam, one pendent head in the men's restroom needs adjustment, heads at some locations are not yet cut into the ceiling tile. Also completed cursory walk through of a tenant improvement on the 5th floor-plans have not been approved or permit issued at this time for completion of this work.
|
INSP-Final Inspection | 5/30/2007 | 6/13/2007 | 6/13/2007 | A | PART |
Forrest France
|
|
|
Completed satisfactory field acceptance testing per NFPA 20 for the fire pump and controller. Test report attached. SLR
|
Plan resubmittals received | | | 6/7/2007 | | |
|
|
|
|
Sprinkler Plan Check | 6/7/2007 | | 6/7/2007 | | FAIL |
|
|
|
Bryan discovered this is not a shell permit modification, it is a new layout design for a new tenant space. We contacted the Delta Fire designer and explained this needs to be submitted as a new FIR permit with the associated TI building permit number shown (or the building work being done to construct the TI space). Also spec sheets for products, e.g. flex piping, spk heads, escutions, etc. need to be submitted. Byan will retain the plans we have, which he will put with the new material when it is submitted.
|
INSP-Sprinkler Rough-in/Hydro | 5/31/2007 | 6/1/2007 | 6/1/2007 | A | PART |
Forrest France
|
|
|
OH fire sprinkler install is okay for cover at the drop ceilings for a portion of the NW quad 1st floor remodel as red lined and initialed on plans.
|
INSP-Sprinkler Rough-in/Hydro | 5/9/2007 | 5/11/2007 | 5/11/2007 | A | PART |
Forrest France
|
|
|
OH rough-in for the 1st floor NE quad is acceptable for cover, also completed satisfactory hydrostatic testing for this area as well.
|
INSP-Sprinkler Rough-in | 4/25/2007 | 5/2/2007 | 5/2/2007 | P | NR |
Forrest France
|
|
|
Fire Pump Test (Forrest) and for Info Sam Per a conversation with Sam this morning we will do a pump run complete with test header flows,bypass flows,emergency power transfer. Phone #: ###-#### Internet Inspection Request from: Lynn Beus ............ Per conversation with the foreman on site, pump testing pending replacement of one component at the discharge side and scheduling with the pump mfr. rep to be present during testing.
|
INSP-Sprinkler Rough-in | 4/27/2007 | 4/30/2007 | 4/30/2007 | P | CANC |
Forrest France
|
|
|
Inspection must be performed per NFPA 20 as required.
|
INSP-Sprinkler Rough-in/Hydro | 4/26/2007 | 4/27/2007 | 4/27/2007 | A | PART |
Forrest France
|
|
|
OH rough-in inspection for the 1st floor SE quad as marked on plans is approved for cover, hydrostatic testing for this portion of the system also completed satisfactory.
|
INSP-Sprinkler Rough-in/Hydro | 4/4/2007 | 4/5/2007 | 4/5/2007 | P | PART |
Forrest France
|
|
|
OH fire sprinkler install at the 5th floor NE quadrant is acceptable for cover, noted one head in an OTS telephone room to be raised closer to the deck for proper heat collection, two arm overs at the restrooms to have hangers within 1' of the pendent head, seismic bracing 80% complete, the OH hydrostatic test is satisfactory.
|
INSP-Sprinkler Rough-in/Hydro | 3/15/2007 | 3/16/2007 | 3/16/2007 | A | PART |
Forrest France
|
|
|
OH hydrostatic test of the SE quadrant 5th floor (Office Max. TI) passed.
|
INSP-Sprinkler Rough-in/Hydro | 3/1/2007 | 3/2/2007 | 3/2/2007 | A | PART |
Forrest France
|
|
|
OH rough-in for the 5th floor SE TI area is okay for cover as noted, need to relocate two overspaced heads at the atrium glass, install head in the janitors closet, repair fireproofing at some hanger locations where removed.
|
INSP-Sprinkler Rough-in/Hydro | 2/28/2007 | 3/1/2007 | 3/1/2007 | P | DEFR |
Forrest France
|
|
|
Rescheduled for 3/2
|
INSP-Sprinkler Rough-in/Hydro | 1/19/2007 | 1/22/2007 | 1/22/2007 | P | PART |
Forrest France
|
|
|
Inspection for overhead rough-in at the 4th floor SW quad is acceptable pending the installation of missing retaining straps at several locations on branch lines and arm-overs in the SW corner of this quadrant, hydrostatic test for the south half of the 4th floor passed.
|
Plan resubmittals received | | | 1/22/2007 | | DONE |
|
|
|
Per Scott A. ok to take in plans without application form. Plans of existing system required for review of previously submitted plans per Bryan Johnson.
|
INSP-Sprinkler Rough-in/Hydro | 1/12/2007 | 1/16/2007 | 1/16/2007 | A | PART |
Forrest France
|
|
|
Inspection for the OH rough-in at the 4th floor SE quad portion as marked on approved plans is okay for cover, noted one head in a conference room to be relocated due to overspacing, one beam clamp in the men's restroom needs adjustment, walls for one room have not been built as shown on plans which may affect coverage if constructed as indicated, sprinklers in the electrical and telephone rooms shall be temp. rated per NFPA 13 2002 8.3.2.1, noted max. bending raduis must not be exceeded for flex head piping per manufacturer requirements, hydrostatic test for this portion of work is acceptable per discussion.
|
INSP-Sprinkler Rough-in/Hydro | 1/11/2008 | 1/14/2007 | 1/14/2007 | A | CANC |
Forrest France
|
|
|
Daryl, ###-####
|
Issue and Print Permit | | | 12/4/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/30/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/30/2006 | | 11/30/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/30/2006 | | DONE |
|
|
|
|
Telephone call | | | 11/30/2006 | | DONE |
|
|
|
lft ms with jeff darr ###-#### that permit and fees are ready to be picked up
|
Sprinkler Plan Check | 11/27/2006 | | 11/29/2006 | | PASS |
|
|
|
Plan modifications -reviewed by B. Johnson. Approved with special conditions.
|
Plan resubmittals received | | | 11/27/2006 | | |
|
|
|
received 3rd set of plans ---received 20 sheets each-plans taken to sam rogers
|
INSP-Sprinkler Rough-in/Hydro | 11/20/2006 | 11/22/2006 | 11/22/2006 | A | PART |
Forrest France
|
|
|
OH rough-in for the 2nd floor SW quad is good for cover. The hydrostatic test for this portion of the 2nd floor also passed inspection as noted on approved plans.
|
Plan resubmittals received | | | 11/13/2006 | | DONE |
|
|
|
per sam rogers
|
INSP-Sprinkler Rough-in/Hydro | 10/27/2006 | 10/30/2006 | 10/30/2006 | A | PART |
Forrest France
|
|
|
Second floor NW quad OH hydrostatic test passed. Rough-in is good for cover at the drop ceiling areas, noted one ssu in the electrical room which needs to be relocated as discussed.
|
Case Summary | | | 10/30/2006 | | |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 10/6/2006 | 10/9/2006 | 10/9/2006 | P | PART |
Forrest France
|
|
|
OH rough-in is good for cover at the 2nd floor NE quadrant as marked on approved plans, hydrostatic test for this area also passed inspection.
|
INSP-Sprinkler Rough-in/Hydro | 9/20/2006 | 9/21/2006 | 9/21/2006 | A | PART |
Forrest France
|
|
|
OH rough-in is acceptable to cover at the drop ceiling areas in the SE quadrant of the second floor as marked on approved plans. Hydrostatic test for this same area also performed satisfactory.
|
Issue permit | | | 8/10/2006 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/7/2006 | | DONE |
|
|
|
issued by mistake, check was not signed so refuded money and they will come back with signed check
|
Permit Ready to Issue | | | 8/7/2006 | | |
|
|
|
change status from issued to RDY
|
Permit Ready to Issue | | | 8/2/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/2/2006 | | 8/2/2006 | | DONE |
|
|
|
|
Telephone call | | | 8/2/2006 | | DONE |
|
|
|
leftvm for jeff@###-####/told permit was ready, permit#, project name & address, and fee. left call back #.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/1/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/1/2006 | | 8/1/2006 | | PASS |
|
|
|
Reviewed by BJ. Partial approval; additional plan information for basement level standpipes and sprinklers is required to be re-submitted at a later date under this permit.
|
Miscellaneous action | | | 7/27/2006 | | DONE |
|
|
|
Approved Early Start request to install EQ bracing on basmt level existing sprinkler system.
|
Miscellaneous action | | | 7/25/2006 | | DONE |
|
|
|
Approved Early Start request to install sprinkler pipe hangers only on second floor only; no piping to be installed.
|
Application received | | | 7/19/2006 | | |
|
|
|
|