INSP-Final Inspection | 12/12/2006 | 12/12/2006 | 12/12/2006 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 12/1/2006 | 12/1/2006 | 12/1/2006 | P | CANC |
Troy Cobbley
|
|
|
No contact phone number given. Unable to do inspection due to Micron plan review and time limitation.
|
INSP-Sprinkler Rough-in/Hydro | 11/27/2006 | 11/28/2006 | 11/28/2006 | P | FAIL |
Troy Cobbley
|
|
|
Before I give the ok to cover the sprinkler piping associated with this scope of work the shell/core piping needs to be inspected and passed. These inspections have not been called in and the plans were not on the job site.
|
INSP-Supply line flush | 11/17/2006 | 11/17/2006 | 11/17/2006 | P | PASS |
Troy Cobbley
|
|
|
Underground supply line flush passed.
|
INSP-Sprinkler Rough-in/Hydro | 11/17/2006 | 11/17/2006 | 11/17/2006 | A | PASS |
Troy Cobbley
|
|
|
Meter proving room sprinkler piping is ok to cover
|
Sprinkler Plan Check | 8/21/2006 | | 8/21/2006 | | PASS |
|
|
|
Reviewed by B.Johnson.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/21/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/21/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/21/2006 | | 8/21/2006 | | DONE |
|
|
|
|
Telephone call | | | 8/21/2006 | | DONE |
|
|
|
left vm for jeff@###-####/told permit was ready, permit#, project name & address, and fee
|
Issue and Print Permit | | | 8/21/2006 | | DONE |
|
|
|
|
Application received | | | 7/20/2006 | | |
|
|
|
|