INSP-Final Inspection | 5/18/2007 | 5/18/2007 | 5/18/2007 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in | 3/29/2007 | 3/30/2007 | 3/30/2007 | A | PART |
Forrest France
|
|
|
The OH install at the drop ceilings in the hallway adjacent to the OR rooms are approved for cover, one head to be added for complete coverage of the pockets along the corridor as discussed, see plans for areas inspected to date.
|
INSP-Sprinkler Rough-in | 3/2/2007 | 3/5/2007 | 3/5/2007 | A | PART |
Forrest France
|
|
|
OH fire sprinkler rough-in as noted on approved plan set is acceptable for cover, c/n items from previous inspection of this area are complete.
|
INSP-Sprinkler Rough-in | 2/26/2007 | 2/26/2007 | 2/26/2007 | P | PART |
Forrest France
|
|
|
OH rough-in is okay for cover at the areas and rooms as circled on approved plans, noted two missing heads in OR17, one damaged head in the corridor, and possible obstruction issues by the curtain track at some patient rooms.
|
INSP-Sprinkler Rough-in | 1/30/2007 | 1/31/2007 | 1/31/2007 | A | PART |
Forrest France
|
|
|
OH sprinkler rough-in at the drop ceilings in area A as marked on approved plan set are okay to cover. Noted two overspaced heads in the play area to be relocated, also noted three heads as circled on plans are not yet completed.
|
INSP-Sprinkler Rough-in | 11/17/2006 | 11/17/2006 | 11/17/2006 | P | PART |
Forrest France
|
|
|
Sprinkler rough-in for cover at the hard lid ceilings in area A as circled and initialed on approved plan set are good for cover.
|
INSP-Final Inspection | 11/7/2006 | 11/8/2006 | 11/8/2006 | A | PART |
Forrest France
|
|
|
Fire sprinkler at the waiting area only as previously inspected is acceptable.
|
INSP-Sprinkler Rough-in | 10/19/2006 | 10/20/2006 | 10/20/2006 | A | PART |
Forrest France
|
|
|
OH rough in at the ground floor section A surgery waiting is okay to cover except one area as circled on approved plans which is overspaced.
|
Issue and Print Permit | | | 8/22/2006 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/21/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/21/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/21/2006 | | 8/21/2006 | | DONE |
|
|
|
|
Telephone call | | | 8/21/2006 | | DONE |
|
|
|
spoke to crystal@###-####/told permit was ready, permit#, project, and fee
|
Sprinkler Plan Check | | | 8/18/2006 | | PASS |
|
|
|
Reviewed by B. Johnson
|
Application received | | | 7/28/2006 | | |
|
|
|
|
Plan assigned to (Bill) | 7/28/2006 | | | | |
|
|
|
|