INSP-Conference | 1/8/2007 | 1/9/2007 | 1/9/2007 | A | DONE |
Troy Cobbley
|
|
|
I went over life safety issues with John. Exit discharge lighting will be required and the two doors behind the platform can remain as long as all hardware is removed and the doors are covered/blocked from view.
|
INSP-Sprinkler Rough-in/Hydro | 1/3/2007 | 1/3/2007 | 1/3/2007 | P | PASS |
Troy Cobbley
|
|
|
Above ground hydro test of the wet and dry system passed. It took two trys for the dry system.
|
INSP-Supply line flush | 12/29/2006 | 12/29/2006 | 12/29/2006 | A | PASS |
Troy Cobbley
|
|
|
Underground hydro and flush is passed. Overhead wet system rough-in is passed.
|
INSP-Supply line flush | 12/14/2006 | 12/14/2006 | 12/14/2006 | A | PASS |
Troy Cobbley
|
|
|
Underground supply piping is ok to cover. I notified the fire sprinkler contractor that the PIV will be required to be electronically supervised and that it would be a good idea to install the conduit in the open trench prior to bury.
|
INSP-Sprinkler Rough-in/Hydro | 11/20/2006 | 11/21/2006 | 11/21/2006 | A | PASS |
Troy Cobbley
|
|
|
24 hour air test on the dry system passed
|
INSP-Sprinkler Rough-in/Hydro | 11/20/2006 | 11/20/2006 | 11/20/2006 | A | PASS |
Troy Cobbley
|
|
|
dry system is ok to cover. The single head in the overbuild area needs relocated. See approved plans for location
|
Issue permit | | | 8/31/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/30/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/30/2006 | | 8/30/2006 | | DONE |
|
|
|
|
Telephone call | | | 8/30/2006 | | DONE |
|
|
|
left vm@###-####/told permit was ready, permit#, project name & address, and fees
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/29/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | | | 8/28/2006 | | PASS |
|
|
|
Reviewed by B. Johnson.
|
Application received | | | 8/1/2006 | | |
|
|
|
|
Plan assigned to (Bill) | 8/1/2006 | | | | |
|
|
|
|