INSP-Final Inspection | 7/26/2007 | 7/27/2007 | 7/27/2007 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 7/25/2007 | 7/26/2007 | 7/26/2007 | A | CANC |
Troy Cobbley
|
|
|
To be rescheduled
|
INSP-Final Inspection | 7/24/2007 | 7/25/2007 | 7/25/2007 | A | FAIL |
Troy Cobbley
|
|
|
The phone line troubles do not report correctly. Also need to test the duct smoke detectors.
|
INSP-Final Inspection | 6/13/2007 | 6/18/2007 | 6/18/2007 | A | FAIL |
Troy Cobbley
|
|
|
See the city approved plans for locations where additional a/v's will be required to be installed. These areas were in question on the reviewed plans. Candella needs to be changed on several of the a/v's as marked on the plans. Also the duct smoke detectors are not attached securely to the duct, are oriented the wrong way and have incorrect sample tube lengths. Contractor is to supply the signals as well at the next inspection.
|
INSP-Final Inspection | 5/4/2007 | 5/4/2007 | 5/4/2007 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given by dave hanniman for the new areas to be occupied while the fire alarm and fire sprinkler systems are finished being installed.
|
Issue and Print Permit | | | 4/9/2007 | | DONE |
|
|
|
|
Alarm Plan Check | 4/5/2007 | | 4/5/2007 | | PASS |
|
|
|
Fire Alarm Review 2nd
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/5/2007 | | |
|
|
|
Ready for Issue
|
Permit Ready to Issue | | | 4/5/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/5/2007 | | 4/5/2007 | | DONE |
|
|
|
|
Telephone call | | | 4/5/2007 | | DONE |
|
|
|
call to ben jackson, left msg to p/u permit, fee $ 200.40
|
Plan resubmittals received | | | 4/2/2007 | | |
|
|
|
|
Telephone call | | | 3/20/2007 | | |
|
|
|
gave plans to customer resubmittal required per mike timmerman
|
Alarm Plan Check | 8/22/2006 | | 8/22/2006 | | FAIL |
|
|
|
Plans show no change in building area, use or occupancy. No building permit has been applied for but the sprinkler plan review indicates a new riser room will be constructed and a building permit is required for the new room. Spoke with Cafe Ole Op's mgr who indicated the sprinklers were required because they "are enclosing the patios". He indicated BRS is the architect and should have submitted plans. I left a voice message for Kyle at BRS to call me. I also left a voice message with Jon Ferrin to call me to discuss the alarm design/plans. Sheet FA1 shows incorrect occupancy group (S1); need correct occupancy group and load and extent of remodel/addition work to evaluate need for manual FA system as part of this project; no sprinkler waterflow monitoring shown on floor plan or riser (just an oversight); no HVAC monitoring shown, need mechanical designer to verified that no smoke detection is required per IMC. Review comments faxed to design engineer and architect.
|
Case Summary | | | 8/4/2006 | | |
|
|
|
|
Application received | | | 8/4/2006 | | |
|
|
|
|
Plan assigned to (Mary) | 8/4/2006 | | | | |
|
|
|
|