INSP-Final Inspection | 4/25/2007 | 4/26/2007 | 4/26/2007 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in | 12/20/2006 | 12/21/2006 | 12/21/2006 | A | PASS |
Troy Cobbley
|
|
|
sprinkler piping is ok to cover. as-builts are needed showing the additional heads
|
FIR-Aging Inspection | 12/5/2006 | 12/5/2006 | 12/8/2006 | | NR |
Troy Cobbley
|
|
|
Work is in progress
|
Issue and Print Permit | | | 9/5/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/5/2006 | | 9/5/2006 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/1/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/1/2006 | | 9/1/2006 | | DONE |
|
|
|
|
Telephone call | | | 9/1/2006 | | DONE |
|
|
|
spoke to brad@###-####/told permit was ready, project name, and fee. Also spoke to him about checks in amount over the permit fees and the past due permit.
|
Sprinkler Plan Check | | | 8/30/2006 | | PASS |
|
|
|
Approved by B. Johnson.
|
Application received | | | 8/14/2006 | | |
|
|
|
|
Plan assigned to (Bill) | 8/14/2006 | | | | |
|
|
|
|