INSP-Final Inspection | 9/28/2006 | 9/29/2006 | 9/29/2006 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled, inspection passed.
|
INSP-Final Inspection | 9/21/2006 | 9/22/2006 | 9/22/2006 | A | PART |
Forrest France
|
|
|
OH rough-in at the drop ceilings is approved for cover.
|
Issue and Print Permit | | | 9/6/2006 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/1/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/1/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/1/2006 | | 9/1/2006 | | DONE |
|
|
|
|
Telephone call | | | 9/1/2006 | | DONE |
|
|
|
left vm for brodie@###-####/told permit was ready, permit#, project name & address, and fee
|
Sprinkler Plan Check | | | 8/30/2006 | | PASS |
|
|
|
Plans reviewed by B. Johnson.
|
Application received | | | 8/14/2006 | | |
|
|
|
|
Plan assigned to (Bill) | 8/14/2006 | | | | |
|
|
|
|