INSP-Final Inspection | 2/22/2007 | 2/23/2007 | 2/23/2007 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 1/30/2007 | 1/31/2007 | 1/31/2007 | A | PASS |
Troy Cobbley
|
|
|
Rough-in inspection passed except the backflow preventor is 6" instead of 4". New hydraulic calculations will be required. Overhead hydro test passed.
|
Plan assigned to (Bill) | 8/15/2006 | | 1/31/2007 | | PASS |
|
|
|
1/31/2007 09:59:58 MWT - activity updated through activity FIRA22 from case FIR06-00499.
|
INSP-Sprinkler Rough-in | 1/25/2007 | 1/26/2007 | 1/26/2007 | P | PASS |
Troy Cobbley
|
|
|
Office area sprinkler piping is ok to cover. A flexible coupling is required at the bottom of the feed piping to this area. I will verify at the next inspection
|
FIR-Aging Inspection | 12/22/2006 | 12/22/2006 | 12/22/2006 | | NR |
Troy Cobbley
|
|
|
work is in progress
|
Issue and Print Permit | | | 9/22/2006 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/21/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/21/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/21/2006 | | 9/21/2006 | | DONE |
|
|
|
|
Telephone call | | | 9/21/2006 | | DONE |
|
|
|
spoke to jeff@###-####/told permit was ready, permit#, project, and fee
|
Sprinkler Plan Check | | | 9/19/2006 | | PASS |
|
|
|
Resubmittal review by B. Johnson
|
Plan resubmittals received | | | 9/12/2006 | | |
|
|
|
|
Sprinkler Plan Check | | | 9/1/2006 | | FAIL |
|
|
|
Plans reviewed and denied by B. Johnson. Left message to call if he needs to pick up plan sets for revision.
|
Application received | | | 8/15/2006 | | |
|
|
|
|