INSP-Final Inspection | 6/7/2007 | 6/11/2007 | 6/11/2007 | A | PASS |
Forrest France
|
|
|
All noted c/n items retested for verification of compliance, final building shell alarm testing completed satisfactory, need map at the panel as discussed and signage at the door to the FACP room to be verified at TI inspections.
|
INSP-Final Inspection | 6/5/2007 | 6/6/2007 | 6/7/2007 | A | FAIL |
Troy Cobbley
|
|
|
See mike timmerman's review comments
|
Inspection | 6/7/2007 | 6/7/2007 | 6/7/2007 | | FAIL |
|
|
|
Fire Alarm Inspection 6/6/2007 by Mike Timmerman
Correction & Remaining Test Items
1. Elevator Lobby Smoke Detectors are to Close to HVAC Diffusers (All Levels)
2. In-Duct Smoke Detector M1-90 Damper 5th Floor not Closing Correctly -Motor Problem
3. Pent House Horns Not Working Wrong Type for System
4. Elevator Machine Room Horn Strobe Not Working Correctly
5. Elevator Machine Room Heat Detector to Far From Sprinkler Head. (Corrected)
6. System Horn Silence Operation Not Working Correctly
7. Need to Test Phone Line Failures
8. Need to Check Monitoring Station Signal Report
9. Need to Check Primary & Alternate Elevator Recall
|
Case Summary | | | 6/6/2007 | | |
|
|
|
|
FIR-Aging Inspection | 3/12/2007 | 3/12/2007 | 3/13/2007 | | DONE |
Forrest France
|
|
|
Building is under construction, work in progress.
|
Permit Ready to Issue | | | 9/7/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/7/2006 | | 9/7/2006 | | DONE |
|
|
|
|
Telephone call | | | 9/7/2006 | | DONE |
|
|
|
left vm for charlie@###-####/told permit was ready, project name & address, permit#, and no fee
|
Issue and Print Permit | | | 9/7/2006 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/6/2006 | | DONE |
|
|
|
|
Alarm Plan Check | | | 8/31/2006 | | PASS |
|
|
|
Plan reviewed and approved by F. Varley without written comments.
|
Miscellaneous action | | | 8/22/2006 | | DONE |
|
|
|
routed to FV for review.
|
Application received | | | 8/15/2006 | | |
|
|
|
|