INSP-Final Inspection | 12/29/2006 | 12/29/2006 | 1/2/2007 | P | PASS |
Forrest France
|
|
|
Per field inspection completed by M. Timmerman, alarm work is satisfactory, permit finaled.
|
Inspection | 12/29/2006 | 12/29/2006 | 12/29/2006 | | PASS |
|
|
|
Inspection of 8th & 9th floor US Bank building. All devices were properly located and installed candela settings OK. EOL voltage was within our requirements. The 8th floor syncronization was not working However the Alarm Contractor was able to correct the problem durring my inspection on the 9th floor. This permit passed inspection. Mike Timmerman 12/29/2006
|
Telephone call | | | 12/29/2006 | | |
|
|
|
Called Forrest and let him know that the inspection Passed and the 8th and 9th floors were acceptable.
|
Issue and Print Permit | | | 9/12/2006 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/8/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/8/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/8/2006 | | 9/8/2006 | | DONE |
|
|
|
|
Telephone call | | | 9/8/2006 | | DONE |
|
|
|
left vm@###-####/told permit was ready, project name & address, and fee
|
Application received | | | 8/16/2006 | | |
|
|
|
|
Case Summary | | | 8/16/2006 | | DONE |
|
|
|
|
Plan assigned to (Mike) | 9/8/2006 | | | | PASS |
|
|
|
Fire Alarm Review Pass - Approved as Noted and Attached Comments
|
Alarm Plan Check | 9/8/2006 | | | | |
|
|
|
Begin Fire Alarm Plan Review
|
Plan assigned to (Mary) | 8/16/2006 | | | | |
|
|
|
|