INSP-Final Inspection | 3/27/2007 | 3/27/2007 | 3/27/2007 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 3/1/2007 | 3/8/2007 | 3/9/2007 | A | FAIL |
Troy Cobbley
|
|
|
The monitoring reports were not on site.
|
INSP-Final Inspection | 2/27/2007 | 2/28/2007 | 2/28/2007 | P | FAIL |
Troy Cobbley
|
|
|
Need to change the the description for the zones at the monitoring agency. Also need the sample tube installed in the duct smoke detector.
|
(F) Reprint permit | | | 2/8/2007 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/8/2007 | | DONE |
|
|
|
|
Plan assigned to (Mike) | 1/25/2007 | | 1/31/2007 | | PASS |
|
|
|
1/31/2007 12:35:43 MWT - activity updated through activity FIRA22 from case FIR06-00614.
|
Alarm Plan Check | 1/31/2007 | | 1/31/2007 | | PASS |
|
|
|
Fire Alarm Plan Modification Review
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/31/2007 | | |
|
|
|
Plan Modification Ready for Issue
|
Inspection Record Card- Fire | 1/31/2007 | | 1/31/2007 | | DONE |
|
|
|
|
Telephone call | | | 1/31/2007 | | DONE |
|
|
|
left msg for keith olstrom on ans mach / permit is ready to p/u fees $171 (vb)
|
Permit Ready to Issue | | | 1/31/2007 | | DONE |
|
|
|
|
Plan assigned to (Mary) | 8/17/2006 | | 1/31/2007 | | PASS |
|
|
|
1/31/2007 12:35:43 MWT - activity updated through activity FIRA22 from case FIR06-00614.
|
FIR-Aging Inspection | 12/8/2006 | 12/8/2006 | 12/11/2006 | | NR |
Troy Cobbley
|
|
|
Work is in progress.
|
Issue and Print Permit | | | 9/8/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/7/2006 | | DONE |
|
|
|
|
Telephone call | | | 9/7/2006 | | DONE |
|
|
|
spoke to keith@###-####/told permit was ready, project name, and no fee
|
Inspection Record Card- Fire | 9/7/2006 | | 9/7/2006 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/6/2006 | | PASS |
|
|
|
Ready for Issue
|
Application received | | | 8/17/2006 | | |
|
|
|
|
Alarm Plan Check | 9/6/2006 | | | | PASS |
|
|
|
Pass
|