Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR06-00641
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 7940 W RIFLEMAN ST
Project NameTowne Square Station
Customer Number 
ePlanReview 
Description
Building "A" (Shell Only) - To construct a new 13,550 square foot, one story, wood framed retail shell building and related site improvements. This is a shell permit only and no occupancy is allowed under this pemit. Separate tenant improvement permits will be required to finish this building for occupancy. All construction per the approved plans. Debest fire protection to install approximately 240 feet of 6" C900 underground fire sprinkler supply piping to building "A" from point of connection located at West Emerald Street.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/9/20074/10/20074/10/2007APASS
DetailsTroy Cobbley
Contact: Todd Phone #: ###-####
INSP-Final Inspection4/3/20074/4/20074/4/2007AFAIL
DetailsTroy Cobbley
need to perform forward flush. trip test of the dry system passed
INSP-Final Inspection3/30/20074/2/20074/2/2007ACANC
DetailsTroy Cobbley
Contact: Todd Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro3/20/20073/21/20073/21/2007APASS
DetailsTroy Cobbley
24 hour air test on the dry system passed.
INSP-Sprinkler Rough-in/Hydro3/19/20073/20/20073/20/2007APART
DetailsTroy Cobbley
Air test on the dry system was started at 8:45am with 40 1/2 lbs.
INSP-Sprinkler Rough-in/Hydro3/1/20073/2/20073/2/2007APART
DetailsTroy Cobbley
Lower area sprinkler piping is ok to cover. Need to remove the plywood from the trusses as discussed. Doghouse area has not been inspected yet.
INSP-Sprinkler Rough-in/Hydro2/27/20072/28/20072/28/2007PPASS
DetailsTroy Cobbley
Above ground hydro test passed.
INSP-Sprinkler Rough-in/Hydro2/27/20072/28/20072/27/2007ACANC
DetailsTroy Cobbley
Contact: Todd Phone #: ###-#### Inspection cancelled from web by: Alicia Pauley
INSP-Sprinkler Rough-in/Hydro11/14/200611/15/200611/15/2006PPASS
DetailsTroy Cobbley
Underground hydro test passed.
INSP-Sprinkler Rough-in10/19/200610/23/200610/23/2006APART
DetailsForrest France
UG hydrostatic test for the fire supply line passed for building address 7960. Requested contractor to call in the correct address and permit number for this inspection activity completed today.
Plan assigned to (Scott)8/28/2006 10/17/2006 PASS
10/17/2006 08:23:28 MWT - activity updated through activity FIRA22 from case FIR06-00803.
INSP-Sprinkler Rough-in/Hydro9/7/20069/8/20069/8/2006PPASS
DetailsTroy Cobbley
Underground supply is ok to bury.
INSP-Sprinkler Rough-in/Hydro9/7/20069/8/20069/7/2006ACANC
DetailsTroy Cobbley
Contact: Todd - Cover Inspection; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
Sprinkler Plan Check8/30/2006 8/30/2006 PASS
Attached review comments to plans.
PLANS/APPL TAKEN TO FRONT DESK  8/30/2006 DONE
Issue and Print Permit  8/30/2006 DONE
Inspection Record Card- Fire8/30/2006 8/30/2006 DONE
Application received  8/28/2006