Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR06-00653
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 3201 W AIRPORT WAY
Project NameAIRPORT
Customer Number 
ePlanReview 
Description
THREE AIRCRAFT LOADING WALKWAYS - BOISE AIR TERMINAL - CONCOURSE B) This building is fire sprinklered to substitute for 1-hr construction. To install three (3) new aircraft loading walkways at the Boise City Airport (Gates 11 and 14 in "Original Concourse B" and Gate 20 in "Concourse B Extension"). New cantilevered floors and new concrete piers will be constructed at Gate 11 and Gate 20. The existing floor and pier at Gate 14 will be maintained and reused. Work is to include concrete piers, cantilevered floor areas (steel beams supporting concrete and metal floor decks), exterior walls at cantilevered floor areas (EIFS, gypsum sheathing, metal studs, batt insulation, vapor barrier, gypsum board), roofs over cantilevered floor areas (steel deck, rigid insulation, single ply membrane roofing), suspended acoustical ceilings, new doors, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. The fire sprinkler work includes adding a total of six new heads as drawn on plans submitted 08-30-2006. This permit is attached to BLD06-01354
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/18/20071/19/20071/19/2007APASS
DetailsForrest France
Final fire sprinkler permit inspection passed, permit finaled.
INSP-Final Inspection1/4/20071/5/20071/5/2007APART
DetailsForrest France
Inspection for gate 11 passed, final for this permit pending completion of fire sprinkler modifications at gate 14.
INSP-Final Inspection12/20/200612/21/200612/21/2006APART
DetailsForrest France
Partial inspection for gate 20 only.
INSP-Final Inspection12/19/200612/20/200612/20/2006ADEFR
DetailsForrest France
No time to complete this inspection today, rescheduled per conversation with contractor.
Plan assigned to (Bill)8/30/2006 12/12/2006 PASS
12/12/2006 15:26:01 MWT - activity updated through activity FIRA22 from case FIR06-00981.
PLANS/APPL TAKEN TO FRONT DESK  9/14/2006 DONE
Permit Ready to Issue  9/14/2006 DONE
Inspection Record Card- Fire9/14/2006 9/14/2006 DONE
Telephone call  9/14/2006 DONE
spoke to brodie@###-####/told permit was ready, project name & address, and fee
Issue and Print Permit  9/14/2006 DONE
Sprinkler Plan Check  9/11/2006 PASS
Reviewed by B. Johnson.
Application received  8/30/2006  
Received by Fax. Quick permit request.