INSP-Final Inspection | 12/28/2006 | 12/28/2006 | 12/28/2006 | P | PASS |
Forrest France
|
|
|
Fire sprinkler passed final inspection, permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 12/27/2006 | 12/27/2006 | 12/27/2006 | A | PART |
Forrest France
|
|
|
Overhead hydrostatic test completed, noted one obstructed head in the mech/storage room off the gym.
|
INSP-Sprinkler Rough-in/Hydro | 12/20/2006 | 12/21/2006 | 12/21/2006 | A | PART |
Forrest France
|
|
|
OH rough-in for the drop ceiling areas is approved for cover, noted upright heads above east restroom hard lids which do not meet spacing requirements, pendent head is to be installed in the drop ceiling now required at the riser room.
|
INSP-Supply line flush | 12/20/2006 | 12/21/2006 | 12/21/2006 | P | PART |
Forrest France
|
|
|
UG supply line flush completed satisfactory.
|
INSP-Supply line flush | 12/20/2006 | 12/21/2006 | 12/21/2006 | A | CANC |
Forrest France
|
|
|
Duplicate inspection request.
|
INSP-Sprinkler Rough-in/Hydro | 10/10/2006 | 10/10/2006 | 10/10/2006 | A | PASS |
Troy Cobbley
|
|
|
Hydro test for the gym area passed. Rough-in for the gym area passed.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/26/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/26/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/26/2006 | | 9/26/2006 | | DONE |
|
|
|
|
Telephone call | | | 9/26/2006 | | DONE |
|
|
|
spoke to tom@###-####/told permit was ready, project name, and fee
|
Issue permit | | | 9/26/2006 | | |
|
|
|
|
(F) Reprint permit | | | 9/26/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | | | 9/21/2006 | | PASS |
|
|
|
Plans reviewed by B. Johnson.
|
Application received | | | 9/1/2006 | | |
|
|
|
|
Case Summary | | | 9/1/2006 | | DONE |
|
|
|
|