INSP-Final Inspection | 12/6/2007 | 12/6/2007 | 12/6/2007 | P | PASS |
Forrest France
|
|
|
UG fire supply line permit finaled.
|
INSP-Supply line flush | 4/16/2007 | 4/17/2007 | 4/17/2007 | P | PART |
Forrest France
|
|
|
Fire supply line flush completed.
|
INSP-Sprinkler Rough-in/Hydro | 4/16/2007 | 4/17/2007 | 4/17/2007 | A | PART |
Forrest France
|
|
|
UG fire supply line hydrostatic test passed.
|
INSP-Sprinkler Rough-in | 12/29/2006 | 1/2/2007 | 1/3/2007 | P | PART |
Forrest France
|
|
|
Duplicated inspection request for the insulation at the vicinity of the tank access lid.
|
INSP-Sprinkler Rough-in | 12/22/2006 | 12/26/2006 | 12/26/2006 | A | PART |
Forrest France
|
|
|
Insulation for the tank at the vicinity of the manhole cover appears to be acceptable.
|
INSP-Sprinkler Rough-in | 9/27/2006 | 9/28/2006 | 9/28/2006 | A | FAIL |
Forrest France
|
|
|
UG fire supply line is not properly freeze protected as required.
|
INSP-Sprinkler Rough-in | 9/19/2006 | 9/20/2006 | 9/20/2006 | A | PART |
Forrest France
|
|
|
UG fire service supply line is acceptable for partial cover, will require an additional inspection to verify frost protection for portions of pipe which may be above min. bury depth.
|
Telephone call | | | 9/13/2006 | | DONE |
|
|
|
spoke to lilly@###-####/told permit was ready, project name, and fee
|
Issue and Print Permit | | | 9/13/2006 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 9/7/2006 | | 9/12/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 9/12/2006 | | 9/12/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/12/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 9/12/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/12/2006 | | 9/12/2006 | | DONE |
|
|
|
|
Case Summary | | | 9/7/2006 | | DONE |
|
|
|
|
Application received | | | 9/7/2006 | | |
|
|
|
|