INSP-Final Inspection | 3/15/2007 | 3/15/2007 | 3/15/2007 | P | PASS |
Forrest France
|
|
|
UG supply line permit finaled.
|
Plan assigned to (Bill) | 9/11/2006 | | 11/6/2006 | | PASS |
|
|
|
11/6/2006 17:03:11 SLR - activity updated through activity FIRA22 from case FIR06-00671.
|
INSP-Sprinkler Rough-in | 9/27/2006 | 9/28/2006 | 9/28/2006 | A | PART |
Forrest France
|
|
|
UG supply line hydro passed, supply line is also approved for cover as the required corrections have been made.
|
INSP-Sprinkler Rough-in/Hydro | 9/13/2006 | 9/14/2006 | 9/14/2006 | A | FAIL |
Forrest France
|
|
|
UG fire supply line does not meet the min. depth of bury requirements for freeze protection per NFPA 13. Per plan review notes and this jurisdiction, the min. depth of bury shall be 4'6" from the top of the pipe to finish grade. Several points along the length of pipe as measured are greater than or equal to 1' too shallow.
|
Issue permit | | | 9/13/2006 | | DONE |
|
|
|
|
Application received | | | 9/11/2006 | | |
|
|
|
|
Sprinkler Plan Check | 9/11/2006 | | 9/11/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/11/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/11/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/11/2006 | | 9/11/2006 | | DONE |
|
|
|
|
Telephone call | | | 9/11/2006 | | DONE |
|
|
|
spoke to joe@###-####/told permit was ready, project name & address, and fees
|