Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR06-00685
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 10051 W EMERALD ST
Project NameEmerald Tech Center Bldg #11
Customer Number 
ePlanReview 
Description
EMERALD TECH CENTER BLDG #11 - To build out first time tenant space of 5,990 sq. ft. for tenant, Executrain, a portion of 13,140 sq. ft. "shell" building, BLD05-00916, still under construction. Work includes furring out and insulating exterior walls from floor to roof deck for energy code compliance; construction of interior non-bearing walls to create five classrooms for continuing education beyond the 12th grade; construct reception / office / admin /testing areas, two fully accessible restrooms, break room and access / egress path connecting two required exits. To install a suspended ceiling grid system and provide electrical, mechanical, plumbing, fire alarm & fire suppression work to meet tenant needs and comply with minimum adopted codes and ordinances or Boise City.
When tenant work affects fire sprinkler protection outside the permitted work area due to the installation of tenant-demising or new partition walls, the affected area sprinkler coverage outside the BLD permit will fall under the Fire Permit scope of work, to maintain the required fire protection within the fire sprinklered facility. The "Riser" and its supplies which include all appurtenances (including tamper, alarm and alarm monitoring) relating to the normal and correct function and integrity of this system will fall under the jurisdiction for code compliant verification. This Fire Sprinkler permit is attached to BLD06-01978
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/6/200610/9/200610/9/2006PPASS
DetailsTroy Cobbley
permit finaled
INSP-Final Inspection10/5/200610/6/200610/6/2006PCANC
DetailsTroy Cobbley
waiting on fire alarm
Override - Parcel Holds1/1/19001/1/190010/6/2006  
INSP-Final Inspection10/4/200610/5/200610/5/2006PCANC
DetailsTroy Cobbley
waiting on alarms
Override - Parcel Holds1/1/19001/1/190010/5/2006  
INSP-Final Inspection10/3/200610/4/200610/4/2006PCANC
DetailsTroy Cobbley
Waiting on fire alarm
Override - Parcel Holds1/1/19001/1/190010/3/2006  
INSP-Sprinkler Rough-in10/2/200610/2/200610/2/2006PPASS
DetailsTroy Cobbley
Sprinkler piping above the ceilings is ok to cover.
INSP-Sprinkler Rough-in9/29/20069/29/20069/29/2006PFAIL
DetailsTroy Cobbley
It appears that the pendants approved to be installed are not listed for quick responce at the temperature and spacing chosen for this project. Two pendant heads have been piped off of the same outlet. The original outlet was hydraulically calculated for 30gpm but now with the two pendants it's flowing 80 gallons. Also in atleast one location the pendant heads are overspaced off of a wall. No other items have been inspected.
Issue and Print Permit  9/13/2006 DONE
Application received  9/11/2006  
Plans were received on 8/23/06 but were somehow given the same FIR number which had been assigned to the fire alarm permit on 8/22. Therefore this new permit number was established today for these sprinkler plans.
PLANS/APPL TAKEN TO FRONT DESK  9/11/2006 DONE
Permit Ready to Issue  9/11/2006 DONE
Inspection Record Card- Fire9/11/2006 9/11/2006 DONE
Telephone call  9/11/2006 DONE
spoke to randy@###-####/told permit was ready, project name & address, and fee
Sprinkler Plan Check  9/7/2006 PASS
Reviewed by B. Johnson.
Plan assigned to (Bill)8/23/2006