INSP-Final Inspection | 5/10/2007 | 5/11/2007 | 5/11/2007 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
Plan assigned to (SAM) | 12/8/2006 | | 5/10/2007 | | PASS |
|
|
|
5/10/2007 11:24:26 SLR - activity updated through activity FIRA22 from case FIR06-00687.
|
Sprinkler Plan Check | 5/10/2007 | | 5/10/2007 | | PASS |
|
|
|
The modified plans have been replaced with the originally approved plan set showing the sprihkler head in the pass through. Now ready for reinspectin on that basis.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/10/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 5/10/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 12/21/2006 | | 12/21/2006 | | FAIL |
|
|
|
This is a Plan Modification to sheet FP2.1.1 REV1. dated 11/6/06, to delete a sprinkler in the pass through shown on the originally approved plans. No change from previous plan notes and discussion with Paul M. and Steve M indicating this sprinkler is required unless they can show a specific code allowance for removing it. No information has been provided. No further action taken at this visit.
|
Sprinkler Plan Check | 12/7/2006 | | 12/7/2006 | | FAIL |
|
|
|
Plans still out for review. No change made to add sprinkler back in the pass-through. Discussed with Paul. Requested their FPE provide us with the NFPA 13 or other applicable code references which he feels would justify this to be a non-sprinklered space within a required sprinklered building and we will consider it further. Otherwise, we will stay with the requirement for a sprinkler head within this space.
|
Plan resubmittals received | | | 11/22/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 11/22/2006 | | 11/22/2006 | | FAIL |
|
|
|
A Plan modification was out for review showing the sprinkler in the pass-thru to be removed. Troy Cobbley refused to sign; referred to S. Rogers to evaluate. I looked at the situation this date and feel it should be sprinklered per req't of NFPA 13, 8.1.1 and because of potential for combustible material to be within the space; due to its size, it will accommodate large trash bins, combustible cartons and material, etc which are present in the areas on both sides of this pass through, and sprinklers are consistent with past practice at Micron.
|
INSP-Final Inspection | 11/6/2006 | 11/7/2006 | 11/13/2006 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
Issue and Print Permit | | | 9/27/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | | | 9/21/2006 | | PASS |
|
|
|
Approved by TC 9/21/06; stamped and signed by SLR 9/21/06.
|
Plan assigned to (Bill) | | | 9/13/2006 | | DONE |
Bill Alexander
|
|
|
This permit was created on the web by Paul Marcolina
|
Application received | | | 9/13/2006 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|