INSP-Final Inspection | 1/11/2007 | 1/12/2007 | 1/12/2007 | A | PASS |
Forrest France
|
|
|
Corrections required verified, noted some heads in need of adjustment for proper installation of the 2nd pc. 401 canopy, final inspection passed.
|
INSP-Sprinkler Rough-in | 12/27/2006 | 12/29/2006 | 12/29/2006 | A | FAIL |
Forrest France
|
|
|
Heads are overspaced in the hallway adjacent to the relocated heads.
|
Issue and Print Permit | | | 10/2/2006 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/29/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/29/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/29/2006 | | 9/29/2006 | | DONE |
|
|
|
|
Telephone call | | | 9/29/2006 | | DONE |
|
|
|
spoke to crystal@###-####/told permit was ready, project name, and fee
|
Sprinkler Plan Check | | | 9/25/2006 | | PASS |
|
|
|
Reviewed by B. Johnson.
|
Case Summary | | | 9/13/2006 | | DONE |
|
|
|
|
Application received | | | 9/13/2006 | | |
|
|
|
|
Plan assigned to (Bill) | 9/13/2006 | | | | |
|
|
|
|