INSP-Final Inspection | 4/5/2007 | 4/6/2007 | 4/6/2007 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Final Inspection | 4/2/2007 | 4/3/2007 | 4/3/2007 | A | FAIL |
Troy Cobbley
|
|
|
The bypass for the forward flow has been provided but the backflow still needs certified and the 2" clearance around the stub-in needs to be provided.
|
INSP-Final Inspection | 3/29/2007 | 4/2/2007 | 4/2/2007 | A | FAIL |
Troy Cobbley
|
|
|
Need to provide 2" clearance around the stub-in, certify the backflow and provide a permanant bypass for the forward flow. The forward flow passed by just spinning the fdc checkvalve so the forward flush does not need to be redone but the by pass will need to be installed.
|
INSP-Final Inspection | 3/26/2007 | 3/26/2007 | 3/27/2007 | P | CANC |
Troy Cobbley
|
|
|
Per Jonathan the inspection was to be done with the fire alarm inspection. That inspection has not been called in yet
|
INSP-Sprinkler Rough-in/Hydro | 3/21/2007 | 3/22/2007 | 3/22/2007 | A | PASS |
Troy Cobbley
|
|
|
Overhead hydro passed.
|
INSP-Sprinkler Rough-in | 1/17/2007 | 1/19/2007 | 1/19/2007 | P | PART |
Troy Cobbley
|
|
|
I inspected the second floor dorm rooms. The upright line located in the peak needs the deflectors positioned horizontal. Also this same line needs to be positioned in the 12" box as detailed in NFPA 13. There is a combustible concealed space that encloses a chimney that will need protection. All of the other lines are ok.
|
INSP-Supply line flush | 1/8/2007 | 1/9/2007 | 1/9/2007 | P | PASS |
Troy Cobbley
|
|
|
Underground flush passed.
|
INSP-Sprinkler Rough-in/Hydro | 1/8/2007 | 1/9/2007 | 1/9/2007 | A | PASS |
Troy Cobbley
|
|
|
Underground hydro passed.
|
FIR-Aging Inspection | 1/5/2007 | 1/5/2007 | 1/8/2007 | | NR |
Troy Cobbley
|
|
|
work is in progress
|
Issue permit | | | 10/4/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/2/2006 | | 10/2/2006 | | DONE |
|
|
|
|
Telephone call | | | 10/2/2006 | | DONE |
|
|
|
tlk to lily that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 10/2/2006 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/29/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | | | 9/26/2006 | | PASS |
|
|
|
Reviewed by B. Johnson.
|
Application received | | | 9/15/2006 | | |
|
|
|
|
Case Summary | | | 9/15/2006 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 9/15/2006 | | | | |
|
|
|
|