Agreement of Future work | 12/4/2006 | 12/4/2006 | 12/18/2007 | | |
|
|
|
Upgrade Agreement Received and OK by Dave Hanneman Boise Fire Marshal Plans Ready for Issue. Original agreement on file in Sam Rogers Office (1555 Shoreline)
|
INSP-Final Inspection | 12/4/2007 | 12/5/2007 | 12/5/2007 | A | PASS |
Forrest France
|
|
|
Fire alarm upgrade completed for this permit.
|
Telephone call | | | 11/2/2007 | | |
|
|
|
Called and left a message with Amy Wray ###-#### to call me with a status of the upgrade agreement progress. Was anticipated to be completed in June 2007. Last inspection was in January of 2007. Will be required to put a permit Hold on the building if a good reason why the agreement has not been completed.
|
INSP-Final Inspection | 1/26/2007 | 1/26/2007 | 1/26/2007 | P | PART |
Forrest France
|
|
|
Verified elevator voltage monitor and waterflow alarm, permit final pending completion of work scope for the 3rd floor.
|
INSP-Alarm Testing | 1/25/2007 | 1/25/2007 | 1/26/2007 | P | DEFR |
Forrest France
|
|
|
Inspection scheduled for 1/26 as agreed.
|
INSP-Final Inspection | 1/16/2007 | 1/17/2007 | 1/17/2007 | P | FAIL |
Troy Cobbley
|
|
|
I gave Don with Russell Corp. permission to use the phase one area of the third floor. See the building approved plans for the exact location marked and signed by me that was inspected. The items remaining include providing an air balance report for the hood and a K class extinguisher. Only the portion of the phase one area on the third floor alarm was tested. The other area was not complete. The lobby areas of the first and second floor fire alarm was tested. This includes the new facp panel, NAC panel, phone lines and elevator recall. See the approved fire alarm prints for devices marked "ok" that have been tested. Signals have been verified as well. Need 120volt monitoring of the elevator power and the correct orfice in the inspectors test connection. Asbuilts will be required to be submitted to the city prior to final.
|
INSP-Final Inspection | 1/15/2007 | 1/16/2007 | 1/16/2007 | P | CANC |
Forrest France
|
|
|
No time to complete inspection due to high volume of scheduled requests.
|
Issue and Print Permit | | | 12/5/2006 | | DONE |
|
|
|
|
Agreement of Future work | 12/4/2006 | 11/6/2007 | 12/4/2006 | | DONE |
|
|
|
Upgrade Agreement Agra Beef
|
Miscellaneous action | | | 12/4/2006 | | DONE |
|
|
|
Faxed letter from Amy Wray, RMH, requesting approval of phased installation of alarm system approved by D. Hanneman today. Now okay to release this permit for the first phase of installation.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/4/2006 | | |
|
|
|
Ready for Issue
|
Inspection Record Card- Fire | 12/4/2006 | | 12/4/2006 | | DONE |
|
|
|
|
Telephone call | | | 12/4/2006 | | DONE |
|
|
|
t/c w David Maxwell at Northwest Fire ###-#### - permit ready and fees given ($213.00)
|
Permit Ready to Issue | | | 12/4/2006 | | DONE |
|
|
|
|
Plan assigned to (Mike) | 9/20/2006 | | 12/4/2006 | | PASS |
|
|
|
12/4/2006 14:26:42 MWT - activity updated through activity FIRA22 from case FIR06-00715.
|
Alarm Plan Check | 11/8/2006 | | 11/8/2006 | | PASS |
|
|
|
Waiting for Up-Grade Agreement & Approval to Issue.
|
Plan resubmittals received | | | 11/3/2006 | | |
|
|
|
|
Telephone call | | | 10/25/2006 | | DONE |
|
|
|
10/25/06 Telcon with Amy Wray - she only knows they were told that the FAC has to be replaced and she is trying to use the same approach as they used for Golden Eagle, at 1101 W. River, to extend the time for installing necessary devices in existing tenant spaces. She asked that we contact Dave Maxwell, for details on why and what is being replaced.
10/25/06 - Dave Maxwell indicated the current panel is a SK-5104, 4-zone panel. He observed the system currently only monitors sprinkler waterflow and approximately 11 120v. smoke detectors on the 1st floor where there is also a mag door hold open. He said there is no monitoring of valve tampers, HVAC. He indicated the proposed alarm system was engineered by Synergy and referred me to Kurt Lichtenberg. I told Dave, his plans need to show the 120v smoke detectors as existing and to be monitored by the new panel, because they have to be maintained per IFC 901.6, unless the owner does a Code evaluation showing that they were/are non-required. He requested I contact Kurt about how to re-write their request to the City.
10/25/06- I called Kurt at Synergy. He indicated they looked at the panel and realized the panel did not provide proper sprinkler monitoring and that would have to be corrected at this TI and that there were not enough zones to properly monitor the sprinkler system, the 1st floor smoke detectors, plus, the new cooking hood and new HVAC duct detectors, and therefore recommended replacement of the FACP panel. Realizing this panel replacement would trigger visual devices per IFC 907.10.1, they proposed installing a/v's in the new tenant space and left it to the owner or vendor to request a deferment agreement to install devices in other tenant spaces as TI's occur. I explained how he could help the owner explain in their letter more specifically what they have and why they are replacing it, and specifically what devices in the existing tenant spaces they wish to defer, e.g. a/v's, duct smoke detection. He said he would do that. I faxed him a copy of their request letter to use as a starting point.
10/25/06 Spoke with Marv Meyer, Russell Corp, GC, explained above telcons. He agreed to work with Amy Wray to include reasons why they need 3 years to complete the work and a phased timetable of when plans will be submitted, work begun and final completion date. Agribeef will have two TI's this year to complete the third floor and one next year for half of the 1st floor.
10/25/06 Discussed above with Dave Hanneman.
|
Telephone call | | | 9/27/2006 | | DONE |
|
|
|
spoke to dave@###-####/told resubmittal was required and plans could be picked up
|
Telephone call | | | 9/26/2006 | | |
|
|
|
Faxed copy of FA Review to Dave Maxwell Northwest Sales and Thad Mason Synergy Engineering.
|
Application received | | | 9/20/2006 | | |
|
|
|
|
Alarm Plan Check | 9/26/2006 | | | | FAIL |
|
|
|
Plans are to do a Fire Alarm Panel Replacement A / V Requirements were not met throughout the building when this type of work is done. See FA Review Doccument
|