INSP-Final Inspection | 1/12/2007 | 1/12/2007 | 1/12/2007 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 1/4/2007 | 1/4/2007 | 1/4/2007 | P | PART |
Forrest France
|
|
|
The remainder of OH sprinkler rough-in is okay to cover.
|
INSP-Sprinkler Rough-in/Hydro | 12/29/2006 | 1/2/2007 | 12/29/2006 | A | CANC |
Forrest France
|
|
|
Contact: Fred; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
|
INSP-Sprinkler Rough-in/Hydro | 12/20/2006 | 12/21/2006 | 12/21/2006 | A | PART |
Forrest France
|
|
|
OH fire sprinkler work is approved for cover at the drop ceiling areas as circled and dated on stamped plan set, items on previous c/n are complete.
|
INSP-Sprinkler Rough-in/Hydro | 12/18/2006 | 12/19/2006 | 12/19/2006 | A | FAIL |
Forrest France
|
|
|
Arm-overs at drops must be supported within 1' and restrained against upward movement due to static pressures above 100psi., need to remove existing upright heads above the drop ceilings, one pendent head is obstructed at an exposed column.
|
Telephone call | | | 10/6/2006 | | DONE |
|
|
|
tlk to receptionist of debest that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 10/6/2006 | | |
|
|
|
|
Issue and Print Permit | | | 10/6/2006 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 9/20/2006 | | 10/5/2006 | | PASS |
|
|
|
10/5/2006 16:27:09 MWT - activity updated through activity FIRA22 from case FIR06-00717.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/5/2006 | | |
|
|
|
Ready for Issue
|
Sprinkler Plan Check | 10/5/2006 | | 10/4/2006 | | PASS |
|
|
|
Sprinkler Review Done by Brian Johnson Logged by Mike Timmerman
|
Application received | | | 9/20/2006 | | |
|
|
|
|