INSP-Final Inspection | 4/13/2007 | 4/13/2007 | 4/13/2007 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 3/29/2007 | 4/2/2007 | 4/2/2007 | A | PART |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 3/23/2007 | 3/26/2007 | 3/26/2007 | A | FAIL |
Troy Cobbley
|
|
|
I showed up for the second time on this inspection and the hvac units still would not turn on. No inspection performed. Re-inspection fee applied
|
INSP-Final Inspection | 3/22/2007 | 3/23/2007 | 3/23/2007 | P | FAIL |
Troy Cobbley
|
|
|
No duct smoke detectors have been tested because the heat would not come on. Also after I called the monitoring company to verify signals I found the monitoring company got zones where as according to the alarm technition the panel should be reporting in points. Per the fire sprinkler contractor this system was never pretested. It appears that I need to start the test over since this has been awaste of time.
|
FIR-Aging Inspection | 1/22/2007 | 1/22/2007 | 1/23/2007 | | NR |
Troy Cobbley
|
|
|
work is in progress
|
Plan assigned to (Mike) | 9/21/2006 | | 12/20/2006 | | PASS |
|
|
|
12/20/2006 10:12:03 SMBT - activity updated through activity FIRA22 from case FIR06-00964.
|
Issue and Print Permit | | | 10/10/2006 | | DONE |
|
|
|
|
Alarm Plan Check | 9/29/2006 | | 9/29/2006 | | PASS |
|
|
|
Fire Alarm System Review
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/29/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 9/29/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/29/2006 | | 9/29/2006 | | DONE |
|
|
|
|
Telephone call | | | 9/29/2006 | | DONE |
|
|
|
spoke to robin@###-####/told permit was ready, project name, and fee
|
Application received | | | 9/21/2006 | | |
|
|
|
|
Case Summary | | | 9/21/2006 | | DONE |
|
|
|
|