INSP-Final Inspection | 11/6/2007 | 11/7/2007 | 11/7/2007 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 9/10/2007 | 9/10/2007 | 9/11/2007 | P | FAIL |
Troy Cobbley
|
|
|
No permanant heat has been provided because the gas meter has not been set up. Can not final the permit.
|
INSP-Final Inspection | 5/10/2007 | 5/10/2007 | 5/10/2007 | P | FAIL |
Troy Cobbley
|
|
|
Need permanant heat installed in building for the fire sprinkler system. All other items are ok. Forward flush passed.
|
INSP-Final Inspection | 5/8/2007 | 5/9/2007 | 5/9/2007 | A | CANC |
Troy Cobbley
|
|
|
Fire alarm contractor was not ready for inspection
|
INSP-Sprinkler Rough-in/Hydro | 5/8/2007 | 5/9/2007 | 5/9/2007 | A | CANC |
Troy Cobbley
|
|
|
Fire alarm contractor was not ready for inspection
|
INSP-Sprinkler Rough-in/Hydro | 5/7/2007 | 5/8/2007 | 5/8/2007 | A | FAIL |
Troy Cobbley
|
|
|
Above ground hydro test failed
|
FIR-Aging Inspection | 1/25/2007 | 1/25/2007 | 1/26/2007 | | NR |
Troy Cobbley
|
|
|
work is in progress
|
Issue and Print Permit | | | 10/20/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | | | 10/19/2006 | | PASS |
|
|
|
Reviewed by B. Johnson
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/19/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/19/2006 | | 10/19/2006 | | DONE |
|
|
|
|
Telephone call | | | 10/19/2006 | | |
|
|
|
tlk to lisa ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 10/19/2006 | | |
|
|
|
|
Case Summary | | | 9/27/2006 | | DONE |
|
|
|
|
Application received | | | 9/27/2006 | | |
|
|
|
|
Pending Assignment by SAM | 9/27/2006 | | | | |
|
|
|
|