INSP-Final Inspection | 12/13/2006 | 12/14/2006 | 12/14/2006 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 12/12/2006 | 12/13/2006 | 12/13/2006 | A | FAIL |
Troy Cobbley
|
|
|
Shut down of the hvac units by the duct smoke detectors did not function. It appears it might be a controls problem.Need to verify signals, install the foam filters on the sample tubes and remove the plastic short sample tubes since the steel one have been provided. All other fire alarm items are ok.
|
INSP-Final Inspection | 12/11/2006 | 12/12/2006 | 12/12/2006 | P | FAIL |
Troy Cobbley
|
|
|
No test performed since a supervisory signal from an unknown source was showing. The electricians where working on it as I left. No inspection performed.
|
Telephone call | | | 12/11/2006 | | DONE |
|
|
|
t/c w Rob Ahten at Protex ###-#### - permit ready and no fees
|
Permit Ready to Issue | | | 12/11/2006 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/11/2006 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/11/2006 | | DONE |
|
|
|
|
Alarm Plan Check | 12/8/2006 | | 12/8/2006 | | PASS |
|
|
|
This is a modification to the existing plans that were approved previously. This plan modification is to add additional strobes in the high piled storage area aisles of the store.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/8/2006 | | |
|
|
|
Ready for Re-Issue
|
Inspection Record Card- Fire | 12/8/2006 | | 12/8/2006 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/30/2006 | | DONE |
|
|
|
|
Plan assigned to (Mike) | 11/30/2006 | | 11/30/2006 | | DONE |
|
|
|
|
Issue and Print Permit | | | 10/5/2006 | | DONE |
|
|
|
|
Plan assigned to (Mike) | 9/28/2006 | | 10/4/2006 | | PASS |
|
|
|
10/4/2006 14:23:06 MWT - activity updated through activity FIRA22 from case FIR06-00750.
|
Alarm Plan Check | 10/4/2006 | | 10/4/2006 | | PASS |
|
|
|
Ready for Issue
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/4/2006 | | |
|
|
|
Ready for Issue
|
Inspection Record Card- Fire | 10/4/2006 | | 10/4/2006 | | DONE |
|
|
|
|
Telephone call | | | 10/4/2006 | | |
|
|
|
lft vm with ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 10/4/2006 | | DONE |
|
|
|
|
Case Summary | | | 9/28/2006 | | DONE |
|
|
|
|
Application received | | | 9/28/2006 | | |
|
|
|
|