INSP-Final Inspection | 9/20/2007 | 9/20/2007 | 9/20/2007 | P | PASS |
Forrest France
|
|
|
UG fire supply line permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 10/23/2006 | 10/24/2006 | 10/24/2006 | A | PART |
Forrest France
|
|
|
UG fire supply line hydrostatic test passed. NOTE: Seismic clearance at the penetration through the foundation wall has been filled with grout which will need to be removed and replaced with a flexible waterproof mastic or equivalent as required.
|
INSP-Sprinkler Rough-in/Hydro | 10/19/2006 | 10/20/2006 | 10/20/2006 | A | NR |
Forrest France
|
|
|
Hydrostatic test for the UG to be rescheduled.
|
INSP-Supply line flush | 10/19/2006 | 10/20/2006 | 10/20/2006 | A | PART |
Forrest France
|
|
|
UG fire supply line flush performed satisfactory.
|
Sprinkler Plan Check | | | 10/16/2006 | | PASS |
|
|
|
Reviewed by B. Johnson
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/16/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/16/2006 | | 10/16/2006 | | DONE |
|
|
|
|
Telephone call | | | 10/16/2006 | | |
|
|
|
picked up by customer before telephoning
|
Permit Ready to Issue | | | 10/16/2006 | | DONE |
|
|
|
|
Issue and Print Permit | | | 10/16/2006 | | DONE |
|
|
|
|
Case Summary | | | 9/29/2006 | | DONE |
|
|
|
|
Application received | | | 9/29/2006 | | |
|
|
|
|
Pending Assignment by SAM | 9/29/2006 | | | | |
|
|
|
|