INSP-Final Inspection | 12/13/2006 | 12/14/2006 | 12/14/2006 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 12/5/2006 | 12/8/2006 | 12/8/2006 | P | PART |
Forrest France
|
|
|
OH fire sprinkler is okay for cover as indicated on site. Noted drops at some locations are not yet complete, missing EQ bracing.
|
INSP-Sprinkler Rough-in/Hydro | 11/17/2006 | 11/21/2006 | 11/22/2006 | A | PART |
Forrest France
|
|
|
Inspection for the underfloor sprinklers is satisfactory. Main tie-ins, OH sprinkler rough-in are not yet complete.
|
Issue and Print Permit | | | 10/16/2006 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/13/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | | | 10/12/2006 | | PASS |
|
|
|
Reviewed by T. Cobbley; stamped 10/13 by SLR.
|
Plan assigned to (Bill) | | | 10/4/2006 | | DONE |
Bill Alexander
|
|
|
This permit was created on the web by Paul Marcolina
|
Application received | | | 10/4/2006 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|