INSP-Final Inspection | 1/17/2007 | 1/17/2007 | 1/17/2007 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 1/16/2007 | 1/17/2007 | 1/17/2007 | A | FAIL |
Troy Cobbley
|
|
|
signals are still screwed up. Now the monitoring agency is not getting the supervisory signals. Everything is coming in as zone one.
|
INSP-Sprinkler Rough-in/Hydro | 1/12/2007 | 1/16/2007 | 1/16/2007 | A | FAIL |
Troy Cobbley
|
|
|
Need to redo the test since the account had not been set up at the monitoring agency. Also need the map at the facp.
|
Issue permit | | | 10/20/2006 | | |
|
|
|
|
Plan assigned to (Mike) | 10/6/2006 | | 10/12/2006 | | PASS |
|
|
|
10/12/2006 11:41:49 MWT - activity updated through activity FIRA22 from case FIR06-00774.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/12/2006 | | |
|
|
|
Ready for Issue
|
Inspection Record Card- Fire | 10/12/2006 | | 10/12/2006 | | DONE |
|
|
|
|
Telephone call | | | 10/12/2006 | | DONE |
|
|
|
tlk to secretary for brent crane ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 10/12/2006 | | |
|
|
|
|
Application received | | | 10/6/2006 | | |
|
|
|
|
Alarm Plan Check | 10/12/2006 | | | | PASS |
|
|
|
Fire Alarm System Review
|