Permit Information
Permit NumberFIR06-00777
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 8540 W ELISA ST
Project NameVictory Business Park BLD A
Customer Number 
ePlanReview 
Description
Install a wet pipe system through out the new structure and exterior canopy. The system is designed to protect Class IV commodities up to 16’-0” in a solid pile configuration. No rack storage has been reviewed or approved under this permit. The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD06-02011. This permit is attached to permit # FIR06-00781.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/13/20074/16/20074/16/2007PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection4/2/20074/3/20074/3/2007AFAIL
DetailsTroy Cobbley
Project is not ready for a final inspection but the sprinkler piping is ok to cover. Per Jonathon the final will be called in when the alarm permit is ready.
INSP-Final Inspection3/26/20073/27/20073/27/2007AFAIL
DetailsTroy Cobbley
hanger did not get installed.
INSP-Final Inspection3/23/20073/23/20073/23/2007PFAIL
DetailsTroy Cobbley
I stopped the inspection after just looking at the east tenant. In the upstairs office areas there are two upright heads on the north side of the ducting that have not been installed, two uprights have been painted and one 2'-5" armover has no hanger
INSP-Sprinkler Rough-in/Hydro3/22/20073/22/20073/22/2007PPASS
DetailsTroy Cobbley
Above ground hydro test passed.
INSP-Sprinkler Rough-in/Hydro3/20/20073/21/20073/21/2007AFAIL
DetailsTroy Cobbley
This is an overhead hydro which failed. The test was done twice today but did not hold pressure.
CHANGE STATUS TO (ISS)  3/15/2007 DONE
picked up plans and re-issued permit
(F) Reprint permit  3/15/2007 DONE
Inspection Record Card- Fire3/15/2007 3/15/2007 DONE
Case Summary  3/14/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/14/2007 DONE
Telephone call  3/14/2007 DONE
tlk to lilly scales ###-#### that permit is ready to be picked up
Permit Ready to Issue  3/14/2007 DONE
Sprinkler Plan Check2/27/2007 3/12/2007 PASS
As Built Plans & Calculation are approved by Bryan Johnson
INSP-Supply line flush3/2/20073/5/20073/5/2007PPASS
DetailsTroy Cobbley
The underground flush for the new building passed. The underground supply for the future building was not flushed.
INSP-Sprinkler Rough-in/Hydro3/2/20073/5/20073/5/2007PPASS
DetailsTroy Cobbley
The underground hydro for the new building passed but had to be measured for leakage. The underground supply for the future building was not tested.
INSP-Sprinkler Rough-in2/27/20072/27/20072/27/2007PPASS
DetailsTroy Cobbley
The 1" piping to the sidewall heads can be covered. Actual sizing will be verified when the requested resubmitted plans are on site for continuation of the inspection.
Plan resubmittals received  2/27/2007 DONE
INSP-Sprinkler Rough-in2/20/20072/20/20072/20/2007PPASS
DetailsTroy Cobbley
The underground piping is ok to cover. The sprinkler piping for the first floor offices is ok to cover as well. Per Nick Anderson the extended coverage sidewall heads will operate off of the existing pipe size but will still be resubmitted.
INSP-Sprinkler Rough-in2/15/20072/16/20072/16/2007AFAIL
DetailsTroy Cobbley
This inspection was for the office areas of the building only. The first problem is the CC upright heads are not installed correctly on the first floor. They exceed the listed 1 1/2" to 4" from the deck.The second problem is the floor plans for the second story area do not match what is existing. Pendants need to be installed in corridors and upright sprinkler heads are missing and additional uprights are going to be required at the office/warehouse separation wall. Thirdly the sprinkler protection for the interior of the outside canopy has been deleted and dry sidewall heads installed to provide protection below. The deleted portion of this sprinkler system was a remote area. Resubmittals, to the city of boise, will be required with all of the changes prior to inspection of the areas that have been effected.
INSP-Sprinkler Rough-in2/14/20072/15/20072/15/2007PFAIL
DetailsTroy Cobbley
Notified fire sprinkler contractor that the underground supply piping is required to be installed with the top of pipe below 4'-6" of the finish grade. A lively discussion ensued with the outcome being the piping is to be buried as stated, 4'-6".
Issue and Print Permit  1/11/2007 DONE
Sprinkler Plan Check1/5/2007 1/10/2007 DONE
Plan are approved as submitted by Bryan Johnson
PLANS/APPL TAKEN TO FRONT DESK  1/10/2007  
Inspection Record Card- Fire1/10/2007 1/10/2007 DONE
Telephone call  1/10/2007 DONE
tlk to lily ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  1/10/2007 DONE
Plan resubmittals received  12/19/2006