INSP-Final Inspection | 12/27/2007 | 12/31/2007 | 12/31/2007 | P | PASS |
Troy Cobbley
|
|
|
Final inspection, under ground flush complete.New set of approved plans with changes made on site. KR
|
Inspection Record Card- Fire | 12/17/2007 | | 12/17/2007 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/17/2007 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/17/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/17/2007 | | DONE |
|
|
|
|
Telephone call | | | 12/17/2007 | | DONE |
|
|
|
tlk to lilly ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 12/17/2007 | | DONE |
|
|
|
|
Plan assigned to (OutSourced) | 11/6/2007 | | 12/17/2007 | | PASS |
|
|
|
12/17/2007 11:33:05 CMB - activity updated through activity FIRA22 from case FIR06-00778.
|
Sprinkler Plan Check | 11/28/2007 | | 12/13/2007 | | PASS |
|
|
|
Pland are approved by Bryan Johnson (Note that this was the 3rd review of these plans)
|
Plan resubmittals received | | | 11/28/2007 | | |
|
|
|
Received application, four binders and four copies of page FP1 (as-builts); taken to fire review
|
(F) Reprint permit | | | 11/28/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/6/2007 | | DONE |
|
|
|
|
Meeting | | | 11/6/2007 | | DONE |
|
|
|
Walk-in meeting requested by Mike Beumeyer re status of plan review. I printed out latest plan review done yesterday and gave it to him.
|
Sprinkler Plan Check | | | 11/5/2007 | | FAIL |
|
|
|
These plans were denied due to lack of correlation between the plans, calculations and the coversheets submitted.
Upon request, the denied set of plans may be retrieved from my office for salvage. Denied plans will be maintained for 5 working days.
|
Plan resubmittals received | | | 10/26/2007 | | |
|
|
|
received fire spr app & "4" books with plans- plans put on fire shelf
|
INSP-Final Inspection | 10/19/2007 | 10/22/2007 | 10/22/2007 | A | FAIL |
Troy Cobbley
|
|
|
A domestic shutoff valve has been installed that is not shown on the plans or in the hydraulic calculations. Provide revised plans to the city of boise for verification of the changes. The wrong backflow has been installed. Provide heads and as-builts per review note #4. Flush the underground supply. Certify backflow.
|
INSP-Final Inspection | 10/3/2007 | 10/5/2007 | 10/5/2007 | A | CANC |
Troy Cobbley
|
|
|
Brian is the contact, thank you. Phone #: ###-#### Internet Inspection Request from: Stan Beus
|
INSP-Final Inspection | 10/1/2007 | 10/3/2007 | 10/3/2007 | A | CANC |
Troy Cobbley
|
|
|
Per Brian there is no access. Permit to be rescheduled
|
INSP-Sprinkler Rough-in | 2/27/2007 | 2/28/2007 | 2/28/2007 | A | PASS |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover
|
INSP-Sprinkler Rough-in | 2/26/2007 | 2/27/2007 | 2/27/2007 | A | PART |
Troy Cobbley
|
|
|
Need as-builts and the tenting modified as discussed prior to an ok to cover.
|
Issue and Print Permit | | | 10/27/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | | | 10/25/2006 | | DONE |
|
|
|
reviewed by J. Johnson.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/25/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/25/2006 | | 10/25/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/25/2006 | | DONE |
|
|
|
|
Telephone call | | | 10/25/2006 | | DONE |
|
|
|
tlk to receptionist ###-#### that permit and fees are ready to be picked up
|
Application received | | | 10/9/2006 | | |
|
|
|
|
Pending Assignment by SAM | 10/9/2006 | | | | |
|
|
|
|
Inspection Record Card- Fire | 12/17/2007 | | | | |
|
|
|
|