INSP-Final Inspection | 11/13/2006 | 11/13/2006 | 11/14/2006 | P | PASS |
Forrest France
|
|
|
Fire alarm permit finaled.
|
INSP-Final Inspection | 11/8/2006 | 11/9/2006 | 11/9/2006 | A | DEFR |
Forrest France
|
|
|
Inspection to be completed by M. Timmerman.
|
Inspection | 11/9/2006 | 11/9/2006 | 11/9/2006 | | PASS |
|
|
|
Conducted fire alarm inspection on the 10th floor Banner Bank, the audibility and synchronization of the notifications pass with flying colors. In-duct detectors and associated dampers were visible and operated as required. EOL voltage was in the 23.8 volt range both circuits with AC power off. Called Forrest and notified him this alarm permit has passed. Mike Timmerman Note the Fire Suppression System is not going to be installed. The area is sprinkled per NFPA13.
|
Issue and Print Permit | | | 10/16/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/13/2006 | | 10/13/2006 | | DONE |
|
|
|
|
Telephone call | | | 10/13/2006 | | DONE |
|
|
|
lft vm with Northwest Sales co ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 10/13/2006 | | |
|
|
|
|
Plan assigned to (Mike) | 10/10/2006 | | 10/12/2006 | | PASS |
|
|
|
10/12/2006 16:20:16 MWT - activity updated through activity FIRA22 from case FIR06-00783.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/12/2006 | | |
|
|
|
Ready For Issue
|
Application received | | | 10/10/2006 | | |
|
|
|
|
Alarm Plan Check | 10/12/2006 | | | | PASS |
|
|
|
Fire Alarm System Review
|