INSP-Final Inspection | 12/8/2006 | 12/8/2006 | 12/8/2006 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 12/8/2006 | 12/8/2006 | 12/8/2006 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 10/24/2006 | 10/25/2006 | 10/25/2006 | A | PART |
Troy Cobbley
|
|
|
The sprinkler piping in the new parapat is ok to cover
|
CHANGE STATUS TO (ISS) | | | 10/24/2006 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/24/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 10/20/2006 | | 10/20/2006 | | PASS |
|
|
|
Plan modification.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/20/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 10/20/2006 | | |
|
|
|
per scott no fees due a plan mod
|
Telephone call | | | 10/20/2006 | | DONE |
|
|
|
no fee due per scott a. a plan mod--left mess that permit is ready
|
Issue permit | | | 10/18/2006 | | |
|
|
|
|
Plan resubmittals received | | | 10/18/2006 | | |
|
|
|
|
Inspection Record Card- Fire | 10/12/2006 | | 10/12/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/12/2006 | | |
|
|
|
|
Telephone call | | | 10/12/2006 | | DONE |
|
|
|
tlk to secretary ###-#### that permit and fees are ready to be picked up
|
Application received | | | 10/11/2006 | | |
|
|
|
|
Pending Assignment by SAM | 10/11/2006 | | 10/11/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 10/11/2006 | | 10/11/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/11/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/12/2006 | | | | |
|
|
|
|