Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR06-00800
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 401 W FRONT ST
Project NameBELLA PLAZA OFFICE BLD
Customer Number 
ePlanReview 
Description
Bella Plaza Office Building (shell & core) - To build a new 87,750 square foot, six story office shell and core building and related site improvements. This building is constructed of a concrete foundation, steel structural frame, concrete on pan deck floors and metal roof deck. This building will contain primarily office occupancies with a fully sprinklered 4,950 square foot bank drive-thru. This is a shell and core permit only. No occupancy is allowed under this permit. Separate tenant improvement permits will be required to finish this building for occupancy. The fire sprinkler system is being used for area increase. All fire sprinkler underground & overhead system , Booster Pump and standpipe work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. The contractor will also install the underground fire service supply install under this permit (See FP-6). This fire permit is attached to building permit: BLD09-00628. This is a shell and core permit only. Separate tenant improvement permits are required to finish this building for occupancy.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/27/20076/27/20076/27/2007PPASS
DetailsForrest France
Building shell and core fire sprinkler permit finaled.
Inspection6/7/20076/7/20076/7/2007 PASS
6/6/2007 Alarm Inspection Only by Mike Timmerman
Tested Main Riser Room Supervisory and Alarm Signals from the Sprinkler System to Fire Alarm Panel Including Dry System (Pass) Checked all Floor Flow & Tampers Fire Pump Run, Power Fail, and Phase Reversal (Pass)
Other Sprinkler Items to be checked by Field Inspector Forrest France
INSP-Final Inspection6/5/20076/6/20076/6/2007ACANC
DetailsTroy Cobbley
This inspection is being cancelled until forrest is back. Sam rogers contacted the contractor.
Case Summary  6/6/2007  
INSP-Sprinkler Rough-in/Hydro5/23/20075/24/20075/24/2007APART
DetailsForrest France
24 hour air testing of the dry system passed.
INSP-Sprinkler Rough-in5/22/20075/23/20075/23/2007APART
DetailsForrest France
Begin 24 hr. air test of the dry system at 9:00am @ 40psi.
INSP-Sprinkler Rough-in5/21/20075/22/20075/22/2007APART
DetailsForrest France
Fire pump acceptance testing completed including manual and automatic starts/stops, flow testing, performance curve, pump and jockey controller testing, timed run, phase reversal, and roof top flow test. Mfg. rep to fax field and shop curve data as discussed. Contractor to change out black steel pipe in the sensing lines for non-corrosive as required, also need to separately pipe the relief valve drain to its own termination point. Noted ball vavles for isolation of the jockey pump have been used in place of the recommended gate or butterfly type, sensing line configuration slightly differs from NFPA 20 figures, noted two pluged outlets on the eccentric reducer.
INSP-Sprinkler Rough-in5/21/20075/22/20075/21/2007ACANC
DetailsForrest France
We are having a pump start up at 8:00am. This is to schedule the start up so you can be there to witness. Mike B is the contact. Thanks Phone #: ###-#### Internet Inspection Request from: Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in/Hydro5/21/20075/21/20075/21/2007PPART
DetailsForrest France
OH hydro for the dry system and the retest of the 3rd and 6th floor wet systems tests passed inspection.
INSP-Sprinkler Rough-in/Hydro5/21/20075/21/20075/21/2007PFAIL
DetailsForrest France
The second same day visit for fire pump testing is not ready for inspection due to leakage at the pump gasket and packing (allowed 25 minutes for contractor to make the necessary repairs which could not be completed while on site), incorrect pump motor rotation, jockey pump rotation not yet verified, concentric and eccentric reducers are installed at the incorrect locations, all sensing line piping shall be non-corrosive, it shall be the contractors responsibility to pre-test the system and it's components prior to scheduling acceptance testing per requirements of NFPA 20.
INSP-Sprinkler Rough-in5/17/20075/21/20075/21/2007AFAIL
DetailsForrest France
We are having a pump start up at 8:00am.
This is to schedule the start up so you can
be there to witness. Mike B is the contact. Thanks Phone #: ###-#### Internet Inspection Request from: Stan Beus...........................Contractor replacing a leaking gasket at the pump, noted installation not ready for inspection at the time of requested site visit.
INSP-Sprinkler Rough-in/Hydro5/15/20075/16/20075/16/2007PNR
DetailsForrest France
Not ready for inspection per conversation with contractor.
INSP-Sprinkler Rough-in/Hydro4/30/20075/1/20075/2/2007PFAIL
DetailsForrest France
Shell OH wet system hydrostatic test failed due to pressure loss at the guages and visible leakage at the 6th and 3rd floors.
INSP-Sprinkler Rough-in4/26/20074/27/20075/1/2007PPART
DetailsForrest France
OH rough-in for the penthouse, 6th and 5th floors are approved, noted one overspaced head at the penthouse to be relocated, also checked previous noted defficiencies on the other floors.
INSP-Sprinkler Rough-in3/20/20073/23/20073/23/2007APART
DetailsForrest France
OH inspection for the shell system floors 1-4 only, noted some items in need of correction including overspaced heads, seismic bracing, heads blocked by beams, incorrect size hangers, and field modifications to be shown on as-builts, all items noted on approved plan set. Also noted TI wall modifications are currently underway on floors 1 and 2.
INSP-Sprinkler Rough-in3/19/20073/20/20073/21/2007PDEFR
DetailsForrest France
Inspection rescheduled.
INSP-Sprinkler Rough-in/Hydro3/13/20073/14/20073/14/2007APART
DetailsForrest France
UG fire supply line hydrostatic test passed.
INSP-Sprinkler Rough-in/Hydro3/13/20073/13/20073/13/2007PDEFR
DetailsForrest France
To be completed 3/14
INSP-Supply line flush3/13/20073/13/20073/13/2007PPART
DetailsForrest France
UG fire supply line flush completed.
INSP-Sprinkler Rough-in11/16/200611/17/200611/17/2006AFAIL
DetailsForrest France
UG fire supply line pipe does not meet the min. depth of bury as required.
Issue and Print Permit  10/30/2006  
PLANS/APPL TAKEN TO FRONT DESK  10/27/2006 DONE
Inspection Record Card- Fire10/27/2006 10/27/2006 DONE
Permit Ready to Issue  10/27/2006 DONE
Sprinkler Plan Check  10/26/2006 PASS
Plans reviewed by B. Johnson.
Application received  10/13/2006  
Pending Assignment by SAM10/13/2006