Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberFIR06-00808
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 950 W BANNOCK ST Unit: 1020
Project Name10TH & BANNOCK
Customer Number 
ePlanReview 
Description
The sprinkler work includes relocating and adding down heads into the new wall and ceiling layout on the 10th floor as indicated on sheet FP-1. It is noted on the plans that only a single head may be supplied from any 1" outlet. When tenant work affects fire sprinkler protection outside the permitted work area due to the installation of tenant-demising or new partition walls, the affected area sprinkler coverage outside the BLD permit will fall under the Fire Permit scope of work, to maintain the required fire protection within the fire sprinklered facility. The "Riser" and its supplies which include all appurtenances (including tamper, alarm and alarm monitoring) relating to the normal and correct function and integrity of this system will fall under the jurisdiction for code compliant verification. The permit is attached to BLD06-02487.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/15/200611/15/200611/15/2006PPASS
DetailsTroy Cobbley
permit finaled
INSP-Final Inspection11/13/200611/13/200611/14/2006PFAIL
DetailsForrest France
Two heads in confrence room 102 are overspaced.
INSP-Final Inspection11/7/200611/8/200611/8/2006ACANC
DetailsForrest France
No time to complete inspection today.
INSP-Sprinkler Rough-in11/7/200611/7/200611/7/2006PPART
DetailsForrest France
OH rough-in at the drop ceiling areas only are good for cover.
Permit Ready to Issue  10/26/2006 DONE
Telephone call  10/26/2006 DONE
tlk to gerald ebeling ###-#### that permit and fees are ready to be picked up
Inspection Record Card- Fire10/26/2006 10/26/2006 DONE
Issue and Print Permit  10/26/2006  
Inspection Record Card- Fire10/26/2006 10/26/2006 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/25/2006 DONE
Application received  10/17/2006  
Sprinkler Plan Check  10/3/2006 PASS
Reviewed by B. Johnson
Pending Assignment by SAM10/17/2006