INSP-Final Inspection | 3/27/2007 | 3/27/2007 | 3/27/2007 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
Case Summary | | | 3/23/2007 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/23/2007 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 3/23/2007 | | |
|
|
|
|
Inspection Record Card- Fire | 3/23/2007 | | 3/23/2007 | | DONE |
|
|
|
|
Telephone call | | | 3/23/2007 | | DONE |
|
|
|
lft ms with vm co for brook ###-#### that permit is ready to be picked up
|
Override - Parcel Holds | | | 3/23/2007 | | |
|
|
|
|
Permit Ready to Issue | | | 3/23/2007 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 3/23/2007 | | |
|
|
|
|
Issue and Print Permit | | | 3/23/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/9/2007 | | 3/21/2007 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
Plan assigned to (Scott) | 3/9/2007 | | 3/9/2007 | | DONE |
|
|
|
change status to REV pending approval of resubmittal
|
Plan resubmittals received | | | 3/9/2007 | | |
|
|
|
Received 1 set of approved plans including application, Boise city fire code review, and page FP-1. Received 1 copy of approved plan on page FP-1 & FP-2. Received 3 copies of new application, 10pg. fire product info, United Water report, and pages FP-1, FP-2, and FP-3; routed to fire review
|
INSP-Final Inspection | 1/10/2007 | 1/10/2007 | 1/10/2007 | P | FAIL |
Troy Cobbley
|
|
|
Project is not ready for a final. Infact plans need to be resubmitted showing the 2" drop down branchlines not forming a loop and also if the ceiling on the second floor is installed as discussed with Terry there will be combustible concealed spaces that will need to be delt with.
|
Override - Parcel Holds | | | 1/10/2007 | | |
|
|
|
Needed Final inspection which has nothing to do with condo plat
|
INSP-Final Inspection | 1/9/2007 | 1/9/2007 | 1/9/2007 | P | CANC |
Troy Cobbley
|
|
|
to be rescheduled
|
Override - Parcel Holds | | | 1/9/2007 | | |
|
|
|
|
Override - Parcel Holds | | | 1/9/2007 | | |
|
|
|
|
Override - Parcel Holds | | | 11/30/2006 | | |
|
|
|
|
Issue and Print Permit | | | 11/30/2006 | | |
|
|
|
|
Sprinkler Plan Check | | | 11/20/2006 | | PASS |
|
|
|
Resubmitted plans reviewed/approved by B. Johnson.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/20/2006 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 11/20/2006 | | |
|
|
|
|
Inspection Record Card- Fire | 11/20/2006 | | 11/20/2006 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 11/20/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 11/20/2006 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/2/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/25/2006 | | DONE |
|
|
|
|
Application received | | | 10/24/2006 | | |
|
|
|
|
Pending Assignment by SAM | 10/24/2006 | | | | |
|
|
|
|
Sprinkler Plan Check | 11/2/2006 | | | | |
|
|
|
|