Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR06-00830
StatusFinaled
Name COMMERCIAL FIRE PROTECTION
Site Address 1845 N WILDWOOD AVE
Project NameSTEELWOOD FLEX CONDOS
Customer Number 
ePlanReview 
Description
The Permitted Work Scope:
FORMER ICE SKATING RINK) This building is fire sprinklered for building area increase, story increase, and for fire area reasons. To create a 1,873 square foot, two story tenant space (1,059 square foot 1st story and 814 square foot 2nd story) within an existing building. The fire sprinkler scope of work includes adding 7 down heads on the second level to accommodate the new wall and ceiling layout. On the lower level, 11 up heads will be added beneath the new second level to complete coverage. Low point drains will be added as required. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. This work permit is attached to BLD06-02208.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/27/20073/27/20073/27/2007PPASS
DetailsTroy Cobbley
permit finaled
Case Summary  3/23/2007  
PLANS/APPL TAKEN TO FRONT DESK  3/23/2007 DONE
Override - Parcel Holds  3/23/2007  
Inspection Record Card- Fire3/23/2007 3/23/2007 DONE
Telephone call  3/23/2007 DONE
lft ms with vm co for brook ###-#### that permit is ready to be picked up
Override - Parcel Holds  3/23/2007  
Permit Ready to Issue  3/23/2007 DONE
Override - Parcel Holds  3/23/2007  
Issue and Print Permit  3/23/2007 DONE
Sprinkler Plan Check3/9/2007 3/21/2007 PASS
Plans are approved by Bryan Johnson
Plan assigned to (Scott)3/9/2007 3/9/2007 DONE
change status to REV pending approval of resubmittal
Plan resubmittals received  3/9/2007  
Received 1 set of approved plans including application, Boise city fire code review, and page FP-1. Received 1 copy of approved plan on page FP-1 & FP-2. Received 3 copies of new application, 10pg. fire product info, United Water report, and pages FP-1, FP-2, and FP-3; routed to fire review
INSP-Final Inspection1/10/20071/10/20071/10/2007PFAIL
DetailsTroy Cobbley
Project is not ready for a final. Infact plans need to be resubmitted showing the 2" drop down branchlines not forming a loop and also if the ceiling on the second floor is installed as discussed with Terry there will be combustible concealed spaces that will need to be delt with.
Override - Parcel Holds  1/10/2007  
Needed Final inspection which has nothing to do with condo plat
INSP-Final Inspection1/9/20071/9/20071/9/2007PCANC
DetailsTroy Cobbley
to be rescheduled
Override - Parcel Holds  1/9/2007  
Override - Parcel Holds  1/9/2007  
Override - Parcel Holds  11/30/2006  
Issue and Print Permit  11/30/2006  
Sprinkler Plan Check  11/20/2006 PASS
Resubmitted plans reviewed/approved by B. Johnson.
PLANS/APPL TAKEN TO FRONT DESK  11/20/2006 DONE
Override - Parcel Holds  11/20/2006  
Inspection Record Card- Fire11/20/2006 11/20/2006 DONE
Override - Parcel Holds  11/20/2006  
Permit Ready to Issue  11/20/2006 DONE
Plan resubmittals received  11/2/2006  
PLANS/APPL TAKEN TO FRONT DESK  10/25/2006 DONE
Application received  10/24/2006  
Pending Assignment by SAM10/24/2006    
Sprinkler Plan Check11/2/2006