Permit Information
Permit NumberFIR06-00831
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 702 W IDAHO
Project NameSPR - Key Bank
Customer Number 
ePlanReview 
Description
*(Key Bank) Steed Construction RCE # 2056. To remodel the entire 9990 sq ft 2nd floor office tenant space per approved plans. Work to include, selective demolition of interior partitions, installation of new noncombustible partitions, doors, side lites, installation of suspended cieling to match existing in areas were demolition has occured, relocation of lighting as required and new dual-level switching requirements to be installed in new office spaces, Hvac ducts and diffusers to be relocated, Fire alarm system to be modified under separate permit, sprinkler system to be modified under separate permit. Miscellaneous related interior finishes.. This building is fully fire sprinklered, any modifications to the sprinkler system shall be per NFPA #13 as regulated by the fire department. *RMH* Shiloh Fire Protection to relocate 19 SSP's add 7 SSP's and plug 2 outlets to accomodate new walls and ceilings.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/6/200612/6/200612/6/2006PPASS
DetailsForrest France
OH fire sprinkler final inspection passed, permit finaled.
INSP-Final Inspection11/6/200611/6/200611/6/2006PPART
DetailsForrest France
Relocated head is acceptable, overhead is okay to cover at the drop ceiling areas.
INSP-Final Inspection11/1/200611/3/200611/3/2006APART
DetailsForrest France
OH rough-in is good for cover at the drop ceiling areas except one office at the north side of the TI where one head is overspaced.
Issue and Print Permit  10/30/2006 DONE
Inspection Record Card- Fire10/27/2006 10/27/2006 DONE
Telephone call  10/27/2006 DONE
tlk to lily ###-#### for randy knutson that permit and fees are ready to be picked up
Permit Ready to Issue  10/27/2006 DONE
Pending Assignment by SAM10/24/2006 10/25/2006 DONE
Sprinkler Plan Check10/25/2006 10/25/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  10/25/2006  
Application received  10/24/2006