Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR06-00840
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 2537 W STATE ST
Project NameST MARY'S CROSSING
Customer Number 
ePlanReview 
Description
The fire sprinkler scope of work consists of adding 36 down heads to accommodate a new wall and ceiling layout. Only a single head shall be supplied from any 1" outlet as drawn.
When tenant work affects fire sprinkler protection outside the permitted work area. The affected area sprinkler coverage outside the BLD permit will fall under the Fire Permit scope of work, to maintain the required fire protection within the fire sprinklered facility. The "Riser" and its supplies which include all appurtenances (including tamper, alarm and alarm monitoring) relating to the normal and correct function and integrity of this system will fall under the jurisdiction for code compliant verification.
This permit is attached to BLD06-02718.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/9/20071/10/20071/10/2007APASS
DetailsForrest France
Fire sprinkler permit finaled, noted one head in the east hallway in need of adjustment, will verifiy correction has been made at building final.
INSP-Final Inspection12/26/200612/27/200612/27/2006APART
DetailsForrest France
Overhead fire sprinkler install is approved for cover at the drop ceilings, final pending field tile and escutcheons.
INSP-Final Inspection12/22/200612/26/200612/26/2006ACANC
DetailsForrest France
kenny; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett
INSP-Final Inspection12/21/200612/22/200612/25/2006PCANC
DetailsForrest France
Inspection rescheduled for 12/26.
Issue and Print Permit  11/17/2006 DONE
Inspection Record Card- Fire11/15/2006 11/15/2006 DONE
Telephone call  11/15/2006 DONE
tlk to brodie stenquist that permit and fees are ready to be picked up
Permit Ready to Issue  11/15/2006  
PLANS/APPL TAKEN TO FRONT DESK  11/14/2006 DONE
Sprinkler Plan Check  11/13/2006 PASS
Reviewed by B. Johnson
Application received  10/26/2006  
Pending Assignment by SAM10/26/2006