Permit Information
Permit NumberFIR06-00841
StatusFinaled
Name IDAHO FIRE PROTECTION
Site Address 301 S ROOSEVELT ST
Project NameSenior Housing Apartments "A"
Customer Number 
ePlanReview 
Description
To install a fire life safety NFPA 13R system to prevent flashover (total involvement) in the room of fire origin, where sprinklered, and to improve the chance for occupants to escape or be evacuated, in a new 5,010-ft/2 single story apartment building. Contract is starting at the discharge side of a 2" Wilkins Series 950XL Backflow Double Check control. An NFPA 13R fire sprinkler protection system is required through out the living area and the exterior entry ways. System shall be equipped with an alarm initiating device connected to an alarm system and an outside annunciating devise. All fire sprinkler work and related, which includes single underground water supply, the system backflow prevention device and domestic shut off valve (provided by others), shall be per NFPA 13R, approved plans, engineering/red-lining and attached review comments, under direction of the Fire Chief. This permit is attached to: BLD05-00993.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/1/20072/2/20072/2/2007APASS
DetailsTroy Cobbley
permit finaled
INSP-Final Inspection2/1/20072/1/20072/1/2007PFAIL
DetailsTroy Cobbley
Need to test interconnection with the fire alarm system prior to finaling.
INSP-Sprinkler Rough-in/Hydro1/22/20071/23/20071/23/2007APASS
DetailsTroy Cobbley
Above ground hydro test passed.
INSP-Sprinkler Rough-in/Hydro1/22/20071/22/20071/22/2007PFAIL
DetailsTroy Cobbley
Hydro test failed
INSP-Supply line flush1/8/20071/8/20071/8/2007PPASS
DetailsTroy Cobbley
Underground flush passed.
INSP-Sprinkler Rough-in12/11/200612/11/200612/11/2006PPASS
DetailsTroy Cobbley
Sprinkler piping is ok to cover.
INSP-Sprinkler Rough-in/Hydro12/8/200612/8/200612/8/2006PFAIL
DetailsTroy Cobbley
Tenting of the sprinkler piping still is not acceptable. I went over the problem areas with the superintendant
INSP-Sprinkler Rough-in/Hydro12/4/200612/4/200612/4/2006AFAIL
DetailsTroy Cobbley
Tenting for the sprinkler piping was not adequate. There are many locations with limited or no tenting. I left a sticker to not cover the sprinkler piping on window.
INSP-Sprinkler Rough-in/Hydro11/27/200611/27/200611/27/2006APART
DetailsTroy Cobbley
Sprinkler piping rough-in passed. Several heads do do meet the spacing requirements from the wall mounted supply diffusers. Per tom and I's discussion he will provide an intermerdiate temp head. Piping cannot be covered until a tenting inspection has been performed.
Sprinkler Plan Check11/15/2006 11/15/2006 PASS
Reviewed by B. Johnson. Approved with conditions for on-site verification.
PLANS/APPL TAKEN TO FRONT DESK  11/15/2006 DONE
Inspection Record Card- Fire11/15/2006 11/15/2006 DONE
Telephone call  11/15/2006 DONE
lft vm with tom dutkus ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  11/15/2006 DONE
Issue and Print Permit  11/15/2006 DONE
Application received  10/27/2006  
Pending Assignment by SAM10/27/2006