INSP-Final Inspection | 3/7/2007 | 3/7/2007 | 3/7/2007 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 2/27/2007 | 2/27/2007 | 2/27/2007 | A | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed.
|
INSP-Supply line flush | 1/8/2007 | 1/8/2007 | 1/8/2007 | P | PASS |
Troy Cobbley
|
|
|
Underground flush passed.
|
INSP-Sprinkler Rough-in/Hydro | 12/21/2006 | 12/22/2006 | 12/22/2006 | A | PASS |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover. Tenting inspection passed.
|
INSP-Sprinkler Rough-in/Hydro | 12/19/2006 | 12/19/2006 | 12/19/2006 | P | PASS |
Troy Cobbley
|
|
|
Sprinkler rough-in passed. Piping connecting the first and second floors has not been installed yet. No tenting has been done yet either.
|
Sprinkler Plan Check | | | 11/15/2006 | | PASS |
|
|
|
Reviewed by B. Johnson. Approved with conditions subject to field verification.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/15/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/15/2006 | | 11/15/2006 | | DONE |
|
|
|
|
Telephone call | | | 11/15/2006 | | DONE |
|
|
|
lft vm with tom dutkus ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 11/15/2006 | | |
|
|
|
|
Issue and Print Permit | | | 11/15/2006 | | DONE |
|
|
|
|
Application received | | | 10/27/2006 | | |
|
|
|
|
Pending Assignment by SAM | 10/27/2006 | | | | |
|
|
|
|