INSP-Final Inspection | 2/1/2007 | 2/2/2007 | 2/2/2007 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 2/1/2007 | 2/1/2007 | 2/1/2007 | P | PASS |
Troy Cobbley
|
|
|
Need to test interconnection with the fire alarm system prior to finaling.
|
INSP-Sprinkler Rough-in/Hydro | 1/22/2007 | 1/23/2007 | 1/23/2007 | A | PASS |
Troy Cobbley
|
|
|
Above ground hydro test passed.
|
INSP-Sprinkler Rough-in/Hydro | 1/22/2007 | 1/22/2007 | 1/22/2007 | P | FAIL |
Troy Cobbley
|
|
|
above ground hydrotest failed
|
INSP-Supply line flush | 1/8/2007 | 1/8/2007 | 1/8/2007 | P | PASS |
Troy Cobbley
|
|
|
Underground flush passed
|
INSP-Sprinkler Rough-in/Hydro | 12/14/2006 | 12/14/2006 | 12/14/2006 | A | PASS |
Troy Cobbley
|
|
|
Tenting inspection passed. Piping is ok to cover.
|
INSP-Sprinkler Rough-in | 12/11/2006 | 12/11/2006 | 12/11/2006 | P | PASS |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover in this building.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/17/2006 | | DONE |
|
|
|
B. Johnson confirmed the provided hydraulic sets (marked buildings A and B) can be used with the system number changed to Bldg C.
|
Inspection Record Card- Fire | 11/17/2006 | | 11/17/2006 | | DONE |
|
|
|
|
Telephone call | | | 11/17/2006 | | DONE |
|
|
|
tlk to recept for tom dutkus ###-#### that permit and fees are ready to be picked up
|
Issue and Print Permit | | | 11/17/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | | | 11/15/2006 | | PASS |
|
|
|
Approval subject to conditions to be field verified by Fire inspector.. Plans reviewed by B. Johnson. Cannot process to the Permit desk because three of the attached hydraulic calculations are marked bldg A and one is marked bldg B. None for Bldg C which is this permit. Hold until clarified by Plan reviewer B. J.
|
Application received | | | 10/27/2006 | | |
|
|
|
|
Pending Assignment by SAM | 10/27/2006 | | | | |
|
|
|
|