INSP-Final Inspection | 11/13/2007 | 11/14/2007 | 11/14/2007 | A | PASS |
Forrest France
|
|
|
UG fire supply line permit finaled.
|
INSP-Final Inspection | 11/12/2007 | 11/13/2007 | 11/13/2007 | P | CANC |
Forrest France
|
|
|
Mike B is the contact, thank you. Phone #: ###-#### Internet Inspection Request from: Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 6/15/2007 | 6/18/2007 | 6/19/2007 | P | PART |
Forrest France
|
|
|
UG fire supply line flush completed satisfactory.
|
INSP-Supply line flush | 6/15/2007 | 6/18/2007 | 6/18/2007 | P | PART |
Forrest France
|
|
|
UG fire supply line hydrostatic test passed.
|
INSP-Sprinkler Rough-in | 3/6/2007 | 3/7/2007 | 3/7/2007 | A | PASS |
Troy Cobbley
|
|
|
The underground supply and remote FDC piping from the last 90 to the inside of the building is ok for cover. Link seal was installed.
|
INSP-Sprinkler Rough-in | 3/5/2007 | 3/5/2007 | 3/5/2007 | P | PART |
Forrest France
|
|
|
UG fire supply line and remote FDC UG piping are good for cover from the point of connection at the street to just prior to the last 90 at the building, will need to verifiy last piece of 4" FDC piping, link seals, and thrust blocking at the 90's which are not yet completed at this time.
|
Issue and Print Permit | | | 11/3/2006 | | DONE |
|
|
|
|
Pending Assignment by SAM | 10/27/2006 | | 10/30/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 10/30/2006 | | 10/30/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/30/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/30/2006 | | 10/30/2006 | | DONE |
|
|
|
|
Telephone call | | | 10/30/2006 | | DONE |
|
|
|
tlk to riandy knutson ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 10/30/2006 | | DONE |
|
|
|
|
Application received | | | 10/27/2006 | | |
|
|
|
|