Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberFIR06-00846
StatusFinaled
Name WESTERN STATES FIRE PROTECTION
Site Address 755 W FRONT ST Unit: 200
Project NameMEULEMAN MOLLERUP LLP BODO 7
Customer Number 
ePlanReview 
Description
To construct a 9,983 square foot office tenant space on the 2nd story of BoDo Building #7 (Northeast corner). Work is to include 2 restrooms accessible to the disabled, a shower room accessible to the disabled, interior nonbearing walls, interior doors, interior windows, suspended acoustical ceilings, suspended gypsum board ceilings, millwork, and interior finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. Western States Fire Protection to raise an existing 4" sprinkler main to accomodate new HVAC tenant modifications.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/28/200612/29/200612/29/2006APASS
DetailsForrest France
Fire sprinkler permit finaled.
INSP-Sprinkler Rough-in12/22/200612/22/200612/22/2006PPART
DetailsForrest France
Overhead sprinkler rough-in is approved for cover at the drop ceiling areas.
Inspection Record Card- Fire11/21/2006 11/21/2006 DONE
Telephone call  11/21/2006 DONE
t/c w Tim Carvo at Western States Fire ###-#### - permit ready and fees given
Permit Ready to Issue  11/21/2006 DONE
CHANGE STATUS TO (ISS)  11/21/2006 DONE
(F) Reprint permit  11/21/2006 DONE
Plan resubmittals received  11/20/2006  
Plan assigned to (SAM)11/20/2006 11/20/2006 PASS
11/20/2006 16:52:49 SLR - activity updated through activity FIRA22 from case FIR06-00846.
Sprinkler Plan Check  11/20/2006 PASS
This is Stage 2 of this permit, to add 94 pendant heads within the TI space. The permit was originally issued as a Quick permit to simply raise the existing overhead feed main to facilitate the construction process. A new fee applies to reflect the additional sprinkler heads involved. (94 heads @ $4.41=414.54 new fee due)
PLANS/APPL TAKEN TO FRONT DESK  11/20/2006  
(F) Reprint permit  10/31/2006  
Pending Assignment by SAM10/27/2006 10/30/2006 DONE
Sprinkler Plan Check10/30/2006 10/30/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  10/30/2006 DONE
Telephone call  10/30/2006  
tlk to mick ###-#### that unable to issue permit intil past due is paid
Issue and Print Permit  10/30/2006 DONE
Inspection Record Card- Fire10/30/2006 10/30/2006 DONE
Telephone call  10/30/2006 DONE
left mess that permit is ready
Application received  10/27/2006