Permit Information
Permit NumberFIR06-00849
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 3064 S BOWN WAY
Project NameBown Crossing Market Place
Customer Number 
ePlanReview 
Description
The Permitted Work Scope:
To construct a 1,656 sq.ft. confectionary shop per approved plans. Work includes construction of perimeter tenant separation wall for this space (leaving approximately 1,948 sq. ft. of first floor 'shell' undeveloped); to construct framed walls to create an accessible unisex restroom and a back storage / work / office area. As part of the Shell permit (BLD03-02192) plans indicate a 1-hour fire resistive floor assembly (U.L. D919) was constructed between the first floor and future residential units above; supporting columns were to be 1-hour construction (U.L. X528) and exterior walls; and a 1-hour shaft enclosure was / is constructed for mechanical and stair enclosures. These elements shall be maintained during the construction. This building is fully sprinklered. The fire sprinkler scope of work includes dropping 16 down heads into the new wall and ceiling layout. A single SSU was added in area 102 to complete coverage.
When tenant work affects fire sprinkler protection outside the permitted work area. The affected area sprinkler coverage outside the BLD permit will fall under the Fire Permit scope of work, to maintain the required fire protection within the fire sprinklered facility. The "Riser" and its supplies which include all appurtenances (including tamper, alarm and alarm monitoring) relating to the normal and correct function and integrity of this system will fall under the jurisdiction for code compliant verification.
This permit is attached to BLD06-02719.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/29/200612/29/200612/29/2006PPASS
DetailsForrest France
Noted that no inspection for cover had been requested or completed prior to final. However, the shop owner removed enough ceiling tile while on site that an adequate installation inspection was completed and the permit could be finaled.
Issue and Print Permit  11/20/2006  
PLANS/APPL TAKEN TO FRONT DESK  11/17/2006 DONE
Inspection Record Card- Fire11/17/2006 11/17/2006 DONE
Telephone call  11/17/2006 DONE
lft brief ms with brodie ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  11/17/2006 DONE
Sprinkler Plan Check  11/15/2006 PASS
Reviewed by B. Johnson.
Case Summary  10/31/2006 DONE
Application received  10/31/2006  
Pending Assignment by SAM10/31/2006