Permit EXPIRED | | | 3/15/2010 | | DONE |
|
|
|
This work was completed by Idaho Fire Protection under permit FIR09-00235
|
INSP-Sprinkler Rough-in/Hydro | 5/10/2007 | 5/11/2007 | 5/11/2007 | A | PART |
Forrest France
|
|
|
OH rough-in is good for cover as red lined on stamped plans, noted and approved ceiling modifications at one area.
|
INSP-Conference | 3/22/2007 | 3/23/2007 | 3/23/2007 | A | DONE |
Forrest France
|
|
|
On site conference regarding work completion issues prior to request for occupancy.
|
INSP-Sprinkler Rough-in/Hydro | 11/30/2006 | 12/4/2006 | 12/4/2006 | A | PART |
Forrest France
|
|
|
OH fire sprinkler install is good for cover at the hard lid ceilings, main tie-ins to be verified when completd.
|
Issue and Print Permit | | | 11/22/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | | | 11/20/2006 | | PASS |
|
|
|
Reviewed by B. Johnson
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/20/2006 | | |
|
|
|
|
Inspection Record Card- Fire | 11/20/2006 | | 11/20/2006 | | DONE |
|
|
|
|
Telephone call | | | 11/20/2006 | | DONE |
|
|
|
tlk to recept for debest that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 11/20/2006 | | DONE |
|
|
|
|
Application received | | | 11/8/2006 | | |
|
|
|
|
Pending Assignment by SAM | 11/8/2006 | | | | |
|
|
|
|