Permit Information
Permit NumberFIR06-00869
StatusFinaled
Name HEWLETT-PACKARD FA
Site Address 11311 W CHINDEN BLVD
Project NameHP Building 3 Upgrade
Customer Number 
ePlanReview 
Description
This permit is to remove and replace 12 existing fire alarm duct smoke detectors with 12 new duct smoke detectors and the installation of a control module used to shut down the Air Handling Units. Building Permit BLD06-02690 is to perform selective demolition of specified HVAC equipment and associated ducts, controls and utilities and at all four corners of Building #3 HP in preparation for expansion of existing corner equipment mezzanine floor area by approximately 375 sq. ft. each; reinstalling existing sunscreen against wall of new build-out. Work includes construction of new reinforced footing and pier, new structural steel columns, floor & roof beams and strengthening of specific existing columns; new steel deck & concrete overlay at mezzanine level and steel deck with single ply roof membrane; modify specific structural framing to allow new openings for ducts at mezzanine & roof; installation of 4 HVAC units, 4 circulating hot water units and all associated equipment and utilities to make new systems operate; complete all exterior finishes (new & reinstalled) & glazing. Special Inspection is required. This building is fully sprinklered for allowable area increase. Expansion area is not normally occupied, mechanical equipment mezzanine. DRH06-00360. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/23/200710/24/200710/24/2007APASS
DetailsTroy Cobbley
Permit finaled
CHANGE STATUS TO (ISS)  9/12/2007 DONE
previously paid
Plan assigned to (Mike)8/24/2007 9/11/2007 PASS
9/11/2007 13:20:56 MWT - activity updated through activity FIRA22 from case FIR06-00869.
Alarm Plan Check  9/11/2007 PASS
Plan Modification Re-Submittal
PLANS/APPL TAKEN TO FRONT DESK  9/11/2007  
Ready for Issue - Plan Modification
Inspection Record Card- Fire9/11/2007 9/11/2007 DONE
Telephone call  9/11/2007 DONE
t/c w jerry fisher at ###-#### - permit ready and no fee - plan mod.
Permit Ready to Issue  9/11/2007  
Plan resubmittals received  8/24/2007  
Received application, three binders and pages 1, 2, 3, 4, 5; taken to fire review
FIR-Aging Inspection4/9/20074/9/20074/11/2007 DONE
DetailsTroy Cobbley
work is still in progress
Issue permit  11/30/2006  
Plan assigned to (Mike)11/8/2006 11/20/2006 PASS
11/20/2006 15:01:04 MWT - activity updated through activity FIRA22 from case FIR06-00869.
Alarm Plan Check11/20/2006 11/20/2006 PASS
Fire Alarm Review
PLANS/APPL TAKEN TO FRONT DESK  11/20/2006  
Ready for Issue
Inspection Record Card- Fire11/20/2006 11/20/2006 DONE
Telephone call  11/20/2006 DONE
left vm for John Hatten at HP ###-#### - permit ready and fees given
Permit Ready to Issue  11/20/2006 DONE
Case Summary  11/8/2006  
Application received  11/8/2006