INSP-Final Inspection | 3/2/2007 | 3/5/2007 | 3/5/2007 | A | PASS |
Forrest France
|
|
|
Corrections field verified for compliance, final inspection passed, permit finaled.
|
INSP-Final Inspection | 3/1/2007 | 3/2/2007 | 3/2/2007 | A | FAIL |
Forrest France
|
|
|
Panel must be programed to provide non-latching supervisory signals for sprinkler tamper switches as required, also need to clear knox box trouble at the panel prior to final. Remainder of alarm work passed inspection.
|
CHANGE STATUS TO (ISS) | | | 11/30/2006 | | DONE |
|
|
|
no fee due
|
Plan assigned to (Mike) | 11/15/2006 | | 11/28/2006 | | PASS |
|
|
|
11/28/2006 13:38:56 MWT - activity updated through activity FIRA22 from case FIR06-00893.
|
Alarm Plan Check | 11/28/2006 | | 11/28/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/28/2006 | | |
|
|
|
Ready for Issue
|
Inspection Record Card- Fire | 11/28/2006 | | 11/28/2006 | | DONE |
|
|
|
|
Telephone call | | | 11/28/2006 | | DONE |
|
|
|
t/c w Linda at Mountain Alarm ###-#### - permit ready and fees given ($150.00)
|
Permit Ready to Issue | | | 11/28/2006 | | DONE |
|
|
|
|
Case Summary | | | 11/15/2006 | | DONE |
|
|
|
|
Application received | | | 11/15/2006 | | |
|
|
|
|