Case Summary | | | 8/28/2008 | | DONE |
|
|
|
|
INSP-Final Inspection | 2/28/2007 | 3/1/2007 | 3/1/2007 | A | PASS |
Forrest France
|
|
|
Corrections field verified, work is complete, fire sprinkler permit finaled.
|
INSP-Final Inspection | 1/9/2007 | 1/10/2007 | 1/10/2007 | P | FAIL |
Forrest France
|
|
|
Missing escutcheons at two locations, some field tile is not installed.
|
INSP-Sprinkler Rough-in | 12/14/2006 | 12/14/2006 | 12/15/2006 | P | PART |
Forrest France
|
|
|
Fire sprinkler rough-in is approved for cover at the drop ceilings, final pending tile and escutcheons.
|
Issue and Print Permit | | | 11/17/2006 | | DONE |
|
|
|
|
Application received | | | 11/16/2006 | | |
|
|
|
|
Sprinkler Plan Check | 11/16/2006 | | 11/16/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/16/2006 | | DONE |
|
|
|
|
Telephone call | | | 11/16/2006 | | |
|
|
|
lft vm with brad bettencourt - ###-#### that permit and fees are ready to be picked up
|
Inspection Record Card- Fire | 11/16/2006 | | 11/16/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/16/2006 | | DONE |
|
|
|
|
Pending Assignment by SAM | 11/16/2006 | | | | |
|
|
|
|