INSP-Final Inspection | 1/30/2007 | 1/31/2007 | 1/31/2007 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 1/23/2007 | 1/23/2007 | 1/23/2007 | P | CANC |
Troy Cobbley
|
|
|
Rafe''s phone Phone #: ###-#### Inspection cancelled from web by: Terry Owsley
|
INSP-Final Inspection | 1/18/2007 | 1/18/2007 | 1/19/2007 | P | CANC |
Troy Cobbley
|
|
|
duplicate inspection
|
INSP-Final Inspection | 1/18/2007 | 1/18/2007 | 1/19/2007 | P | FAIL |
Troy Cobbley
|
|
|
Only one of the of the four duct detectors installed is what was submitted. The one in the southeast corner has the sample tubes wrong and the hvac unit itself would not operate. The smoke detector in the riser room needs to be located at the deck and tested. The tamper switch zone did not work and will need to be retested. I also need a signal report.
|
Plan resubmittals received | | | 12/20/2006 | | |
|
|
|
|
Telephone call | | | 11/29/2006 | | DONE |
|
|
|
t/c w Rob Ahten at Protex ###-#### - permit ready and no fees
|
Permit Ready to Issue | | | 11/29/2006 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/29/2006 | | DONE |
|
|
|
|
Plan assigned to (Mike) | 11/16/2006 | | 11/28/2006 | | PASS |
|
|
|
11/28/2006 16:31:57 MWT - activity updated through activity FIRA22 from case FIR06-00905.
|
Alarm Plan Check | 11/28/2006 | | 11/28/2006 | | PASS |
|
|
|
Fire Alarm Review
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/28/2006 | | |
|
|
|
Ready For Issue
|
Inspection Record Card- Fire | 11/28/2006 | | 11/28/2006 | | DONE |
|
|
|
|
Case Summary | | | 11/16/2006 | | DONE |
|
|
|
|
Application received | | | 11/16/2006 | | |
|
|
|
|