INSP-Final Inspection | 2/7/2007 | 2/7/2007 | 2/7/2007 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 1/23/2007 | 1/23/2007 | 1/23/2007 | P | FAIL |
Troy Cobbley
|
|
|
Items noted on previous correction notice have been correct. Can not final until the ceiling tile has been installed. I notified Jim, the superintendent of this. He stated it would be done friday.
|
INSP-Final Inspection | 1/22/2007 | 1/22/2007 | 1/22/2007 | P | FAIL |
Forrest France
|
|
|
Pendent head at the main entry is not correctly installed, provide consistent temp. ratings of sprinklers installed at common fire areas, rough-in at the kitchen drop ceilings is good for cover.
|
INSP-Sprinkler Rough-in | 12/21/2006 | 12/22/2006 | 12/22/2006 | A | PART |
Forrest France
|
|
|
Rough-in is okay for cover at the hard lid ceilings on the first and second floors only. Two heads at the 1st floor sushi bar soffit to be added and verified for compliance at the next scheduled inspection.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/30/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/30/2006 | | 11/30/2006 | | DONE |
|
|
|
|
Telephone call | | | 11/30/2006 | | DONE |
|
|
|
tlk to secretary for brodie that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 11/30/2006 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/30/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 11/17/2006 | | 11/28/2006 | | PASS |
|
|
|
Reviewed by B. Johnson
|
Application received | | | 11/17/2006 | | |
|
|
|
|
Pending Assignment by SAM | 11/17/2006 | | | | |
|
|
|
|
Inspection Record Card- Fire | 11/30/2006 | | | | |
|
|
|
|